The Colorado Department of Revenue (CDOR) submits the following 2025 Departmental Regulatory Agenda Report (Report) in fulfillment of the statutory requirements set forth in §2-7-202(6), 2-7-203, and 24-4-103.3(4), C.R.S. Pursuant to state law, annually on November 1 executive-branch agencies must file the Report in order to provide results of the past year's rulemaking activity. Pursuant to §2-7- 202(6), C.R.S., the Report must contain:

  • (f) Commencing with departmental regulatory agendas submitted on and after November 1, 2013, a list and brief summary of all permanent and temporary rules actually adopted since the previous departmental regulatory agenda was filed. Pursuant to §24-4-103.3(4), C.R.S., the Report must contain:
  • (4) Each principal department shall include a report on the results of its mandatory review of rules as part of its departmental regulatory agenda that it submits to the staff of the legislative council for distribution to the applicable committee of reference of the general assembly as outlined in section 2-7-203, C.R.S. The Agenda is to be filed with Legislative Council Staff for distribution to committee(s) of reference, posted on CDOR’s website, and submitted to the State Library, the Colorado Department of Regulatory Agencies, and the Secretary of State for publication in the Colorado Register.

CDOR must also present its Report as part of its “SMART Act” presentation pursuant to §2-7-203(2)(a), C.R.S. CDOR works with several boards and commissions that promulgate rules; for ease of use for the consumer, those rules are included in CDOR's Report. The Report covers Calendar Year 2025 (CY25). Rules that will be completed after November 1, 2025, are marked as "ongoing" or "in progress".

Results of Activity Included in Last 2025 Regulatory Agenda
Rule Number (ex: 1 CCR 201-1, Rule #101)Rule Title (or Brief Description)New rule, revision, or repeal?Statutory or other basis for adoption of rulePurpose (For the change, ex: legislation)StakeholdersStatusAdoption Date (if applicable)Comments
1 CCR 212-3 Rule 2-100 SeriesFeesNew44-10-103, 44-10-202(1)(b), 44- 10-202(1)(c), 44-10-202(1)(e), 44- 10-203(1)(k), 44-10-203(1)(i), 44- 10-203(2)(b), 44-10-203(2)(h), 44- 10-203(2)(q), 44-10-203(2)(w), 44-10-203(2)(dd)(XII), 44-10-303 (2)(b), 44-10-310(7), 44-10-313, 44-10-401, 44-10-801, 44-10-802, 44-10-803, 44-10-1201, 44-10- 1202, C.R.S. Authority also exists in the Colorado Constitution at Article XVIII, Subsection 16(5)(a) (II).Revision, Statutory, HB 25-1209 Legislation Implementation and SB 24-076 Legislation ImplementationMED Stakeholder ListOngoingAnticipated adoption date 11/5/2025HB 25-1209 required a new copy fee, SB 24-076 required a reduction in fees for unified applications
1 CCR 212-3 Rule 2-145 Social Equity FeesFeesNew44-10-103, 44-10-202(1)(b), 44- 10-202(1)(c), 44-10-202(1)(e), 44- 10-203(1)(k), 44-10-203(1)(i), 44- 10-203(2)(b), 44-10-203(2)(h), 44- 10-203(2)(q), 44-10-203(2)(w), 44-10-203(2)(dd)(XII), 44-10-303 (2)(b), 44-10-308(5); 44-10-310 (7), 44-10-313, 44-10-401, 44-10- 801, 44-10-802, 44-10-803, 44-10- 1201, 44-10-1202, C.R.SRevision, Statutory, and SB 44-076 Legislation ImplementationMED Stakeholder ListOngoingAnticipated adoption date 11/5/2025SB 24-076 required a reduction in fees for unified applications

MED Stakeholder List: The standard MED stakeholder list includes Licensees, Division listserv subscribers, local licensing authorities, local law enforcement, healthcare providers, researchers, public safety advocates, Colorado Department of Agriculture, Colorado Department of Public Health and Environment, and the general public.

Unplanned Rulemaking - Not Part of Regulatory Agenda or Mandatory Rules Review
Rule Number (ex: 1 CCR 201-1, Rule #101)Rule Title (or Brief Description)New rule, revision, or repeal?Statutory or other basis for adoption of rulePurposeStakeholdersStatusAdoption Date (if applicable)Comments (optional)
1 CCR 212-3 Rule 1-115DefinitionsRevision44-10-202(1)(c), 44-10-202(1)(j), and 44-10-103, C.R.S.Added the following definitions: Active THC, Physical Separation-Based Regulated Marijuana Concentrate, R-and-D Unit, Unified Application Clarified, updated, or corrected the following definitions: Adverse Health Event, Adverse Weather Event, Beneficial Owner, Denied Applicant, Employee License, Harvest Batch, Identification Badge, Indirect Financial Interest Holder, Inventory Tracking System, Kief, Limited Access Area, Multiple-Serving Edible Retail Marijuana Product,Owner License, Penny Stock, Production Batch, Public Money, Qualified Institutional Investor, Regulated Marijuana Cultivation Facility, Regulated Marijuana Products Manufacturer, Regulated Marijuana Store, Restricted Access Area, Retail Marijuana Business, Retail Marijuana Cultivation Facility, Retail Marijuana Products Manufacturer, Retail Marijuana Store, Sample Increment, Single-Serving Edible Retail Marijuana Product, Standardized Serving of Marijuana Removed the following definitions: Identification Badge, Physical Separation-Based Medical Marijuana Concentrate, Physical Separation-Based Retail Marijuana Concentrate, Sample Manager, Sampling UnitMED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 2-213 2-110(A)(1) (c)(ii) & 1 CCR 2-213 2- 145(B)(1)(c)(ii)Requests for a Finding of Suitability, Owner License and Temporary Appointees – Initial Application and Renewal Fees. Social Equity FeesRevision44-10-103, 44-10-202(1)(b), 44- 10-202(1)(c), 44-10-202(1)(e), 44- 10-203(1)(k), 44-10-203(1)(i), 44- 10-203(2)(b), 44-10-203(2)(h), 44- 10-203(2)(q), 44-10-203(2)(w), 44-10-203(2)(dd)(XII), 44-10-303 (2)(b), 44-10-310(7), 44-10-313, 44-10-401, 44-10-801, 44-10-802, 44-10-803, 44-10-1201, 44-10- 1202, C.R.S. Authority also exists in the Colorado Constitution at Article XVIII, Subsection 16(5)(a) (II). and 44-10-103, 44-10-202(1)(b), 44- 10-202(1)(c), 44-10-202(1)(e), 44- 10-203(1)(k), 44-10-203(1)(i), 44- 10-203(2)(b), 44-10-203(2)(h), 44- 10-203(2)(q), 44-10-203(2)(w), 44-10-203(2)(dd)(XII), 44-10-303 (2)(b), 44-10-308(5); 44-10-310 (7), 44-10-313, 44-10-401, 44-10- 801, 44-10-802, 44-10-803, 44-10- 1201, 44-10-1202, C.R.S.Rule was revised to clarify when the first License Fee payment is due to the Division.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 2-213 2-115(E) & 1 CCR 2-213 2-125(D)Regulated Marijuana Business Initial Application & License FeesNew44-10-103, 44-10-202(1)(b), 44- 10-202(1)(c), 44-10-202(1)(e), 44- 10-203(1)(k), 44-10-203(1)(i), 44- 10-203(2)(b), 44-10-203(2)(h), 44- 10-203(2)(q), 44-10-203(2)(w), 44-10-203(2)(dd)(XII), 44-10-303 (2)(b), 44-10-310(7), 44-10-313, 44-10-401, 44-10-801, 44-10-802, 44-10-803, 44-10-1201, 44-10- 1202, C.R.S. Authority also exists in the Colorado Constitution at Article XVIII, Subsection 16(5)(a) (II). and 44-10-103, 44-10-202(1)(b), 44- 10-202(1)(c), 44-10-202(1)(e), 44- 10-203(1)(k), 44-10-203(1)(i), 44- 10-203(2)(b), 44-10-203(2)(h), 44- 10-203(2)(q), 44-10-203(2)(w), 44-10-203(2)(dd)(XII), 44-10-303 (2)(b), 44-10-310(7), 44-10-313, 44-10-401, 44-10-801, 44-10-802, 44-10-803, 44-10-1201, 44-10- 1202, C.R.S. Authority also exists in the Colorado Constitution at Article XVIII, Subsection 16(5)(a) (II).Added new Rule to account for Unified Application fee reduction in accordance with SB 24-076.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 2-213 2-120(B)(2)Permit FeesRevision44-10-103, 44-10-202(1)(b), 44- 10-202(1)(c), 44-10-202(1)(e), 44- 10-203(1)(k), 44-10-203(1)(i), 44- 10-203(2)(b), 44-10-203(2)(h), 44- 10-203(2)(q), 44-10-203(2)(w), 44-10-203(2)(dd)(XII), 44-10-303 (2)(b), 44-10-310(7), 44-10-313, 44-10-401, 44-10-801, 44-10-802, 44-10-803, 44-10-1201, 44-10- 1202, C.R.S. Authority also exists in the Colorado Constitution at Article XVIII, Subsection 16(5)(a) (II).Rule was revised to clarify which fees the rule is referring to.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 2-140(A)Other Application FeesNew44-10-103, 44-10-202(1)(b), 44- 10-202(1)(c), 44-10-202(1)(e), 44- 10-203(1)(k), 44-10-203(1)(i), 44- 10-203(2)(b), 44-10-203(2)(h), 44- 10-203(2)(q), 44-10-203(2)(w), 44-10-203(2)(dd)(XII), 44-10-303 (2)(b), 44-10-310(7), 44-10-313, 44-10-401, 44-10-801, 44-10-802, 44-10-803, 44-10-1201, 44-10- 1202, C.R.S. Authority also exists in the Colorado Constitution at Article XVIII, Subsection 16(5)(a) (II).A license application copy request fee was introduced. The new fee is required under HB 25-1209.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 2-145(C)(4) & 1 CCR 212-3 2-145(D) (4)Social Equity FeesNew44-10-103, 44-10-202(1)(b), 44- 10-202(1)(c), 44-10-202(1)(e), 44- 10-203(1)(k), 44-10-203(1)(i), 44- 10-203(2)(b), 44-10-203(2)(h), 44- 10-203(2)(q), 44-10-203(2)(w), 44-10-203(2)(dd)(XII), 44-10-303 (2)(b), 44-10-308(5); 44-10-310 (7), 44-10-313, 44-10-401, 44-10- 801, 44-10-802, 44-10-803, 44-10- 1201, 44-10-1202, C.R.S.Added new Rule to account for Unified Application fee reduction.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 2-215(E)(1) & 1 CCR 212-3 2-215(E) (2)All Application RequirementsRevision44-10-202(1)(c), 44-10-203(1)(k), 44-10-203(2)(a), 44-10-203(2)(c), 44-10-203(2)(k), 44-10-203(2)(w), 44-10-305, 44-10-307, 44-10-308, 44-10-309, 44-10-310, 44-10-311, 44-10-312, 44-10-313, 44-10-314 and 44-10-316, C.R.S.Made LLA and Local Jurisdiction plural to account for Unified Applications that may have licenses in different jurisdictions.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 2-220(A.5)Initial Application Requirements for Regulated Marijuana BusinessesNew44-10-202(1)(c), 44-10-202(1)(e), 44-10-203(1)(c), 44-10-203(1)(j), 44-10-203(1)(k), 44-10-203(2)(a), 44-10-203(2)(w), 44-10-203(2) (ee), 44-10-203(7), 44-10-301, 44- 10-305, 44-10-307, 44-10-308, 44- 10-309, 44-10-310, 44-10-311, 44- 10-312, 44-10-313, and 44-10- 316, C.R.S.New rule to clarify when documents apply to more than one license in a Unified Application only a single copy of the document is required to be submitted.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 2-225(A)(1)Renewal Application Requirements for All LicensesRevision44-10-202(1)(c), 44-10-202(1)(e), 44-10-203(1)(c), 44-10-203(2)(a), 44-10-203(2)(c), 44-10-203(2)(w), 44-10-203(2)(ee), 44-10-203(7), 44-10-305(2)(b)(l)(C). 44-10-307, 44-10-308, 44-10-309, 44-10-313, 44-10-314, and 44-10-316 C.R.S.Added Owner Entity Licenses for clarity.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 2-225(A)(1) (a)Renewal Application Requirements for All LicensesNew44-10-202(1)(c), 44-10-202(1)(e), 44-10-203(1)(c), 44-10-203(2)(a), 44-10-203(2)(c), 44-10-203(2)(w), 44-10-203(2)(ee), 44-10-203(7), 44-10-305(2)(b)(i)(C), 44- 10-307, 44-10-308, 44-10-309, 44-10-313, 44-10-314, and 44-10-316, C.R.S.New rule to account for expiration date alignment of licenses included in Unified Applications.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 2-225(B)(1)Renewal Application Requirements for All LicensesNew44-10-202(1)(c), 44-10-202(1)(e), 44-10-203(1)(c), 44-10-203(2)(a), 44-10-203(2)(c), 44-10-203(2)(w), 44-10-203(2)(ee), 44-10-203(7), 44-10-305(2)(b)(l)(C). 44-10-307, 44-10-308, 44-10-309, 44-10-313, 44-10-314, and 44-10-316 C.R.S.Rule was revised to remove the requirement to mail the renewal notice and it was replaced with electronic mailing address of record in accordance with HB 25-1209.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 2-225(G.5)Renewal Application Requirements for All LicensesNew44-10-202(1)(c), 44-10-202(1)(e), 44-10-203(1)(c), 44-10-203(2)(a), 44-10-203(2)(c), 44-10-203(2)(w), 44-10-203(2)(ee), 44-10-203(7), 44-10-305(2)(b)(l)(C). 44-10-307, 44-10-308, 44-10-309, 44-10-313, 44-10-314, and 44-10-316 C.R.S.New rule to clarify when documents apply to more than one license in a Unified Application only a single copy of the document is required to be submitted .MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 2-245(C)(2) (c), 1 CCR 212-3 2-265(B) (3), 1 CCR 212-3 2-265 (C), 1 CCR 212-3 2-265 (E)(1)(c), 1 CCR 212-3 2- 265(I)(2), & 1 CCR 212-3 2-265(J)(2)Change of Beneficial Owner Application or Notification Owner and Employee License: License Requirements, Applications, Qualifications, and PrivilegesRevision44-10-202(1)(e), 44-10-203(1)(d), 44-10-203(1)(k), 44-10-203(2)(ee) (I)(A) and (E), 44-10-203(7), 44- 10-308(3)(b), 44-10-309, 44-10- 310, 44-10-311, 44-10-312, 44-10- 505(1)(a), and 44-10-605(1)(a), C. R.S. and 44-10-202(1)(c), 44-10-202(1)(e), 44-10-203(1)(l), 44-10-203(2)(b)- (c), 44-10-203(2)(e), 44-10-203(2) (t)-(u), 44-10-203(2)(w), 44-10- 307, 44-10-308(2), 44-10-313(6), 44-10-401(2)(c), 44-10-901(1), 24- 76.5-101 et seq., C.R.S.Revised rules to remove "identification badge" from the rules in accordance with HB 25-1209.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 2-255(C) & 1 CCR 212-3 2-255(C.5)Change of Location of a Regulated Marijuana BusinessRevision44-10-202(1)(c), 44-10-202(1)(e), 44-10-203(1)(k), 44-10-203(2)(a), 44-10-203(2)(e), 44-10-203(2)(w), 44-10-203(2)(cc), 44-10-305, 44- 10-313(8), and 44-10-313(13), C. R.S.Revised Change of Location (COL) rules to issue either a COL permit or COL approval letter.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 2-255(F)(1) (e)Change of Location of a Regulated Marijuana BusinessRepeal44-10-202(1)(c), 44-10-202(1)(e), 44-10-203(1)(k), 44-10-203(2)(a), 44-10-203(2)(e), 44-10-203(2)(w), 44-10-203(2)(cc), 44-10-305, 44- 10-313(8), and 44-10-313(13), C. R.S.Repealed requirement for a mobile hospitality vehicle to provide a automated vehicle tag with a change of location.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 2-265 Basis & Purpose & 1 CCR 212-3 3-205 Basis & PurposeOwner and Employee License: License Requirements, Applications, Qualifications, and Privileges Limited Access AreasRevision44-10-202(1)(c), 44-10-202(1)(e), 44-10-203(1)(l), 44-10-203(2)(b)- (c), 44-10-203(2)(e), 44-10-203(2) (t)-(u), 44-10-203(2)(w), 44-10- 307, 44-10-308(2), 44-10-313(6), 44-10-401(2)(c), 44-10-901(1), 24- 76.5-101 et seq., C.R.S. and 44-10-103(14), 44-10-103(26), 44- 10-202(1)(c), 44-10-202(1)(e), 44- 10-203(1)(k), 44-10-203(1)(l), 44- 10-203(2)(h), 44-10-203(2)(p), and 44-10-203(2)(t), C.R.S.Added citation for new employee license requirement in accordance with HB 25-1209.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 2-265(C)(1)Owner and Employee License: License Requirements, Applications, Qualifications, and PrivilegesRevision44-10-202(1)(c), 44-10-202(1)(e), 44-10-203(1)(l), 44-10-203(2)(b)- (c), 44-10-203(2)(e), 44-10-203(2) (t)-(u), 44-10-203(2)(w), 44-10- 307, 44-10-308(2), 44-10-313(6), 44-10-401(2)(c), 44-10-901(1), 24- 76.5-101 et seq., C.R.S.Revised rule to clarify activities that a person performs which will require an employee license to "handle or transport".MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 2-265(C)(3)Owner and Employee License: License Requirements, Applications, Qualifications, and PrivilegesRevision44-10-202(1)(c), 44-10-202(1)(e), 44-10-203(1)(l), 44-10-203(2)(b)- (c), 44-10-203(2)(e), 44-10-203(2) (t)-(u), 44-10-203(2)(w), 44-10- 307, 44-10-308(2), 44-10-313(6), 44-10-401(2)(c), 44-10-901(1), 24- 76.5-101 et seq., C.R.S.Added language to clarify that if an employee enters data into the ITS they need an employee license.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 2-265(D) & 1 CCR 212-3 2-265(F)Owner and Employee License: License Requirements, Applications, Qualifications, and PrivilegesRepeal44-10-202(1)(c), 44-10-202(1)(e), 44-10-203(1)(l), 44-10-203(2)(b)- (c), 44-10-203(2)(e), 44-10-203(2) (t)-(u), 44-10-203(2)(w), 44-10- 307, 44-10-308(2), 44-10-313(6), 44-10-401(2)(c), 44-10-901(1), 24- 76.5-101 et seq., C.R.S.Repealed, moved to rule 3-205.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 2-265(H) & 1 CCR 212-3 2-265(I)(2)Owner and Employee License: License Requirements, Applications, Qualifications, and PrivilegesRepeal44-10-202(1)(c), 44-10-202(1)(e), 44-10-203(1)(l), 44-10-203(2)(b)- (c), 44-10-203(2)(e), 44-10-203(2) (t)-(u), 44-10-203(2)(w), 44-10- 307, 44-10-308(2), 44-10-313(6), 44-10-401(2)(c), 44-10-901(1), 24- 76.5-101 et seq., C.R.S.Repealed rules related to Colorado residency.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 2-265(I)(1) (d)Owner and Employee License: License Requirements, Applications, Qualifications, and PrivilegesRevision44-10-202(1)(c), 44-10-202(1)(e), 44-10-203(1)(l), 44-10-203(2)(b)- (c), 44-10-203(2)(e), 44-10-203(2) (t)-(u), 44-10-203(2)(w), 44-10- 307, 44-10-308(2), 44-10-313(6), 44-10-401(2)(c), 44-10-901(1), 24- 76.5-101 et seq., C.R.S.Removed fingerprint requirement for CBOs at renewal in accordance with HB 25-1209.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 2-265(I)(1) (e), 1 CCR 212-3 2-265(I) (2)(a) & 1 CCR 212-3 2- 265(I)(2)(b)Owner and Employee License: License Requirements, Applications, Qualifications, and PrivilegesRepeal44-10-202(1)(c), 44-10-202(1)(e), 44-10-203(1)(l), 44-10-203(2)(b)- (c), 44-10-203(2)(e), 44-10-203(2) (t)-(u), 44-10-203(2)(w), 44-10- 307, 44-10-308(2), 44-10-313(6), 44-10-401(2)(c), 44-10-901(1), 24- 76.5-101 et seq., C.R.S.Repealed - no longer needed with no Colorado residency requirement and no differentiation between ID badge and Owner LicenseMED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 2-270(G)Application Denial, Voluntary Withdrawal, and Effect of License Surrender, Revocation, or Expiration on Related ApplicationsNew44-10-202(1)(c), 44-10-202(1)(e), 44-10-203(1)(k), 44-10-203(2)(a), 44-10-203(2)(l)-(m), 44-10-203(2) (w), 44-10-305, 44-10-306, 44-10- 307, 44-10-313(8), 24-4-104, and 24-4-105, C.R.S.New rule to account for Unified Applications in accordance with SB 24-076.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 3-110(C)(2) (a)Regulated Marijuana Businesses: General RestrictionsRevision44-10-202(1)(c), 44-10-203(1)(k), 44-10-203(2)(g), 44-10-203(2)(h), 44-10-401(2), 44-10-701(1)(a), 44- 10-701(3)(d), and 44-10-701(3)(f), C.R.S.Rule was revised to add a Regulated Marijuana Testing Facility may share a Licensed Premises with a Natural Medicine Testing Facility. Rules were also added for the use of shared equipment and space.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 3-225(C)(1)Video SurveillanceRevision44-10-203(2)(h), 44-10-203(1)(k), 44-10-203(2)(e), 44-10-313(14), and 44-10-1001, C.R.S. Authority also exists in the Colorado Constitution at Article XVIII, Subsection 16(5)(a)(VI).Rule was revised to list the areas where camera coverage is required in accordance with HB 25-1209.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 3-225(C)(5)Video SurveillanceRevision44-10-203(2)(h), 44-10-203(1)(k), 44-10-203(2)(e), 44-10-313(14), and 44-10-1001, C.R.S. Authority also exists in the Colorado Constitution at Article XVIII, Subsection 16(5)(a)(VI).Rule was revised to strike requirement for ingress and egress of Flowering areas to remain constantly illuminated for recording purposes.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 3-225(C)(6)Video SurveillanceRevision44-10-203(2)(h), 44-10-203(1)(k), 44-10-203(2)(e), 44-10-313(14), and 44-10-1001, C.R.S. Authority also exists in the Colorado Constitution at Article XVIII, Subsection 16(5)(a)(VI).Rule was revised to aligned where cameras are required with (C)(1) and removed requirement for camera to be facing the primary entry door.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 3-225(C)(7), 1 CCR 212-3 3-225(C)(8), & 1 CCR 212-3 3-225(D) (3)Video SurveillanceRepeal44-10-203(2)(h), 44-10-203(1)(k), 44-10-203(2)(e), 44-10-313(14), and 44-10-1001, C.R.S. Authority also exists in the Colorado Constitution at Article XVIII, Subsection 16(5)(a)(VI).Rules were repealed in accordance to HB 25-1209.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 3-225(E)(1)Video SurveillanceRevision44-10-203(2)(h), 44-10-203(1)(k), 44-10-203(2)(e), 44-10-313(14), and 44-10-1001, C.R.S. Authority also exists in the Colorado Constitution at Article XVIII, Subsection 16(5)(a)(VI).Rule was revised to aligned expectations of where in the LAA must be continuously recorded with (C)(1).MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 3-225(F)(1)Video SurveillanceRevision44-10-203(2)(h), 44-10-203(1)(k), 44-10-203(2)(e), 44-10-313(14), and 44-10-1001, C.R.S. Authority also exists in the Colorado Constitution at Article XVIII, Subsection 16(5)(a)(VI).Rule was revised to strike reference to map of camera locations and maintenance and access logs.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 3-230 Basis & PurposeWaste DisposalRevision44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-203(2)(h), 44-10-203(2)(i), and 44-10-203(2) (x), C.R.S. Authority also exists in the Colorado Constitution at Article XVIII, Subsection 16(5)(a) (VII).Basis and Purpose was revised to add Fibrous Waste statutes from 3-235.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 3-230(A)Waste DisposalRevision44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-203(2)(h), 44-10-203(2)(i), and 44-10-203(2) (x), C.R.S. Authority also exists in the Colorado Constitution at Article XVIII, Subsection 16(5)(a) (VII).Rule was revised to add "and Fibrous Waste" to the existing rule.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 3-230(E)(2) (b)(iii) & 1 CCR 212-3 3-230(E)(2)(b)(vi)Waste DisposalRepeal44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-203(2)(h), 44-10-203(2)(i), and 44-10-203(2) (x), C.R.S. Authority also exists in the Colorado Constitution at Article XVIII, Subsection 16(5)(a) (VII).Rule was repealed in accordance to HB 25-1209.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 3-230(G.5)Waste DisposalRevision44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-203(2)(h), 44-10-203(2)(i), and 44-10-203(2) (x), C.R.S. Authority also exists in the Colorado Constitution at Article XVIII, Subsection 16(5)(a) (VII).Rule was revised to add requirements for Fibrous Waste from 3-235 that were not duplicative.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 3-235Transfers of Fibrous WasteRepeal44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(2)(h), 44-10-203(2)(i), 44-10-203(1)(k), and 44-10-203(2) (x), C.R.S.Rules were repealed and condensed into rule 3-230.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 3-240(C)(1) (e)Collection of Marijuana Consumer WasteRepeal44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-203(2)(h), and 44-10-203(2)(bb), C.R.S.Rule was repealed in accordance to HB 25-1209.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 3-240(F)Collection of Marijuana Consumer WasteRevision44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-203(2)(h), and 44-10-203(2)(bb), C.R.S.Rule was revised to remove the reference to 3-905 and requirement for contracts and receipts related to consumer waste be maintained.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 3-330(D)(1) (b), 1 CCR 212-3 3-330 (D)(1)(b)(i), 1 CCR 212-3 3-330(D)(1)(b)(iii), & 1 CCR 212-3 3-330(D)(1)(c)Cultivation of Regulated Marijuana: Specific Health and Safety RequirementsRevision44-10-203(1)(c), 44-10-203(1)(k), 44-10-203(2)(d), 44-10-203(2)(g), 44-10-203(2)(h), 44-10-203(2)(i), 44-10-203(3)(c), 44-10-203(3)(e), and 44-10-1001, C.R.S.Rules were revised to add "Production Batches" for clarity and compliance.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 3-330(D)(1) (c)Cultivation of Regulated Marijuana: Specific Health and Safety RequirementsRevision44-10-203(1)(c), 44-10-203(1)(k), 44-10-203(2)(d), 44-10-203(2)(g), 44-10-203(2)(h), 44-10-203(2)(i), 44-10-203(3)(c), 44-10-203(3)(e), and 44-10-1001, C.R.S.Rule was revised to add "Regulated Marijuana" and "Production Batches" for clarity and compliance.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 3-335(D)(4) (f)(ii)Production of Regulated Marijuana Concentrate and Regulated Marijuana Products: Specific Health and Safety RequirementsRevision44-10-203(1)(c), 44-10-203(1)(k), 44-10-203(2)(d), 44-10-203(2)(f), 44-10-203(2)(g), 44-10-203(2)(h), 44-10-203(2)(i), 44-10-202(2)(y), 44-10-203(3)(b), 44-10-203(3)(c), 44-10-203(3)(d), 44-10-203(3)(e), 44-10-203(3)(g), and 44-10-1001, C.R.S.Rule was revised to remove reference to Rule 6-1110(C.5).MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 3-405(A)(1) (c)IdentificationRevision44-10-202(1)(c), 44-10-203(1)(k), 44-10-203(2)(v), 44-10-203(2)(z), 44-10-401(2)(a)(I), 44-10-401(2) (b)(I), 44-10-501(3)(b), 44-10-501 (3)(c), 44-10-501(3)(d), 44-10-501 (4), 44-10-501(10)(b)(II), 44-10- 601(3)(b), 44-10-701(1)(b), 44-10- 701(2)(a), 44-10-701(4)(a), and 44-10-701(5)(a), C.R.S.Rule was revised to clarify that the physician certification must be presented by a patient to a Medical store prior to any Transfer to a patient by the Medical store.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 3-610(E)Off-Premises Storage of Regulated Marijuana: All Regulated Marijuana BusinessesRevision44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-203(2)(h), 44-10-203(2)(n), 44-10-313(14), 44-10-505(2), 44-10-605(2), and 44-10-1001(2), C.R.S.Rule was revised to remove "Transfer" from the rule for clarity.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 3-615(A)(5) (b)(iii)Regulated Marijuana Delivery PermitsNew44-10-202(1), 44-10-203(1)(c), 44- 10-203(1)(k), 44-10-203(2)(h), 44- 10-203(2)(n), 44-10-203(2)(dd), C. R.S.New rule to account for delivery permit license terms changing to maintain an aligned expiration date with associated Unified Applications.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 3-615(F)(3) & 1 CCR 212-3 3-615(F) (6)Regulated Marijuana Delivery PermitsRevision44-10-202(1), 44-10-203(1)(c), 44- 10-203(1)(k), 44-10-203(2)(h), 44- 10-203(2)(n), 44-10-203(2)(dd), C. R.S.Rules were revised to strike references to 3-905 and requirement to maintain delivery contracts.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 3-615(G)(9)Regulated Marijuana Delivery PermitsRevision44-10-202(1), 44-10-203(1)(c), 44- 10-203(1)(k), 44-10-203(2)(h), 44- 10-203(2)(n), 44-10-203(2)(dd), C. R.S.Rule was revised to change citation from 3-235 (now repealed) to 3-230.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 3-805(E)(5) (a)Regulated Marijuana Businesses: Inventory Tracking SystemNew, 44-10-201(1), 44-10-202(1)(a), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-203(2)(h), 44-10-501(1)(b), 44-10-502(2), 44-10-503(1)(b), 44- 10-505(3), 44-10-601(1)(d), 44-10- 602(3), 44-10-603(1)(b), 44-10- 605(3), and 44-10-610(3)(a), C.R. S.A new rule was added to allow for the combining of packages of trim allocated for extraction prior to testing, with conditions.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 3-805(I)(4)Regulated Marijuana Businesses: Inventory Tracking SystemRevision, 44-10-201(1), 44-10-202(1)(a), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-203(2)(h), 44-10-501(1)(b), 44-10-502(2), 44-10-503(1)(b), 44- 10-505(3), 44-10-601(1)(d), 44-10- 602(3), 44-10-603(1)(b), 44-10- 605(3), and 44-10-610(3)(a), C.R. S.Rule was revised to add "maintaining, or re-authorizing" and "in accordance with Inventory tracking System functionality" for clarity and compliance.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 3-820 Basis & PurposeSampling Units Tracking RequirementsRevision44-10-201, 44-10-202(1)(a), 44- 10-202(1)(c), 44-10-502(3), 44-10- 503(10), 44-10-602(6), 44-10-603 (10), 44-10-607, and 44-10-608, C.R.S.Basis and Purpose was revised to add new statutory sections 44-10-607 and 44-10-608.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 3-905 Basis & PurposeBusiness RecordsRevision44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-301, and 44-10-1001(1), C.R.S.Basis and Purpose was revised to add new statutory section 44-10-1001(1)(4).MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 3-905(A)(2) (a) & 1 CCR 212-3 3-905 (A)(2)(b)Business RecordsRevision44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-301, and 44-10-1001(1), (3), and (4), C.R. S.Rules were revised to add an exception for tax documents to not be maintained or archived on the Licensed Premises.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 3-905(B)(8), 1 CCR 212-3 3-905(B)(9), 1 CCR 212-3 3-905(B) (10), 1 CCR 212-3 3-905 (B)(14), 1 CCR 212-3 3- 905(B)(15), 1 CCR 212-3 3-905(B)(20), 1 CCR 212- 3 3-905(B)(26), 1 CCR 212-3 3-905(B)(27), 1 CCR 212-3 3-905(B)(28), 1 CCR 212-3 3-905(B)(31) & 1 CCR 212-3 3-905(B) (34)Business RecordsRepeal44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-301, and 44-10-1001(1), (3), and (4), C.R. S.Rules were repealed in accordance to HB 25-1209.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 3-905(C)Business RecordsRevision44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-301, and 44-10-1001(1), (3), and (4), C.R. S.Rule was revised to add "licensees are not required to maintain duplicate copies of records that are required to be maintained in the Inventory Tracking System".MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 3-905(C)(3)Business RecordsRevision44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-301, and 44-10-1001(1), (3), and (4), C.R. S.Rule was revised to require only managers and employees who are designated to receive R-and-D Units to be required to be listed in an Regulated Marijuana Businesses Inventory Tracking System (ITS). Previously the rule required all employees who report to the Licensed Premises be in the ITS. Additionally, added Designated Test Batch Collectors to align with Rule 4-225.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 3-905(G)Business RecordsNew44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-301, and 44-10-1001(1), (3), and (4), C.R. S.Added a new rule (G) stating the SLA may require a licensee to maintain additional records upon a finding of a violation.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 3-920(C)Regulated Marijuana Business Reporting RequirementsRevision44-10-201(4), 44-10-202(1)(c), 44- 10-202(1)(a), 44-10-204(1)(a), 44- 10-203(1)(k), 44-10-313(12), and 44-10-701(2)(a), C.R.S.Rule was revised to change "48 hours" to "two calendar days" and add reporting requirements for Adverse Health Events which were removed from the definition.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 3-930 Basis & PurposeRequest for Business Records from the DivisionRevision44-10-202(1)(c), 44-10-203(1)(c), 44-10-204, 44-10-301, 44-10-801 (3)(a)(VI), and 44-10-1001(1), C. R.S.Basis and Purpose was revised to add statutory citation for new 44-10-801(3)(a)(VI).MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 3-930(A)(1)Request for Business Records from the DivisionRevision44-10-202(1)(c), 44-10-203(1)(c), 44-10-204, 44-10-301, 44-10-801 (3)(a)(VI), and 44-10-1001(1), C. R.S.Rule was revised to replace "two calendar years" with "four calendar years" to account for two year license terms and new fee requirement for application copy requests.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 3-930(A)(4)Request for Business Records from the DivisionRevision44-10-202(1)(c), 44-10-203(1)(c), 44-10-204, 44-10-301, 44-10-801 (3)(a)(VI), and 44-10-1001(1), C. R.S.Rule was revised to add fee requirements for application copy requests in accordance with HB 25-1209.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 3-1005(E)(2) (e) & 1 CCR 212-3 3-1005 (E)(2)(f)Packaging and Labeling: Minimum Requirements Prior to Transfer to a Regulated Marijuana Business, except to a Regulated Marijuana Testing FacilityRepeal44-10-202(1)(a), 44-10-202(1)(c), 44-10-202(6), 44-10-203(2)(f), 44- 10-203(1)(k), 44-10-203(3)(a)-(b), 44-10-601(2)(a), 44-10-601(5), 44- 10-603(1)(d), 44-10-603(4)(a), and 44-10-603(8), C.R.S.Rules were repealed in accordance to HB 25-1209.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 3-1005(E)(2) (h)Packaging and Labeling: Minimum Requirements Prior to Transfer to a Regulated Marijuana Business, except to a Regulated Marijuana Testing FacilityNew44-10-202(1)(a), 44-10-202(1)(c), 44-10-202(6), 44-10-203(2)(f), 44- 10-203(1)(k), 44-10-203(3)(a)-(b), 44-10-601(2)(a), 44-10-601(5), 44- 10-603(1)(d), 44-10-603(4)(a), and 44-10-603(8), C.R.S.Added new rule that an R-and-D Unit label must include that it cannot be sold or resold.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 3-1010(D)(1) (d)Packaging and Labeling: General Requirements Prior to Transfer to a Patient or ConsumerRevision44-10-202(1)(a), 44-10-202(1)(c), 44-10-202(6), 44-10-203(2)(f), 44- 10-203(1)(k), 44-10-203(3)(a)-(b), 44-10-601(2)(a), 44-10-601(5), 44- 10-603(1)(d), 44-10-603(4)(a), and 44-10-603(8), C.R.S.Rule was revised to add "Single serving" for clarity. In addition, made existing "Single Serving" lowercase (not a defined term).MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 3-1010(D)(4) (a) & 1 CCR 212-3 3-1010 (D)(4)(b)Packaging and Labeling: General Requirements Prior to Transfer to a Patient or ConsumerNew44-10-202(1)(a), 44-10-202(1)(c), 44-10-202(6), 44-10-203(2)(f), 44- 10-203(1)(k), 44-10-203(3)(a)-(b), 44-10-601(2)(a), 44-10-601(5), 44- 10-603(1)(d), 44-10-603(4)(a), and 44-10-603(8), C.R.S.Added new rule to clarify packaging requirements for pre-rolled and infused pre-rolled marijuana.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 3-1015(B)(3) (c)(ii)Additional Labeling Requirements Prior to Transfer to a Patient or ConsumerRevision44-10-202(1)(a), 44-10-202(1)(c), 44-10-202(6), 44-10-203(2)(d)(IV) (A)-(C), 44-10-203(2)(f), 44-10- 203(2)(w), 44-10-203(1)(a), 44- 10-601(2)(a), 44-10-603(4)(a), and 44-10-603(8), C.R.S.Rule was revised to add "past the labeled expiration date" to clarify when an edible product cannot be transferred to a patient or consumer.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 3-1020(B)(2)Packaging and Labeling: Requirements for Transfers to a Consumer at a Retail Marijuana Hospitality and Sales BusinessRevision44-10-202(1)(a), 44-10-202(1)(c), 44-10-202(6), 44-10-203(2)(ff), 44-10-305(2)(b), 44-10-609, and 44-10-610, C.R.S.Rule was revised for clarity to encompass new defined term Active THC.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 3-1025(B)Packaging and Labeling: Minimum Requirements for Test Batch Transfers to a Regulated Marijuana Testing FacilityRevision44-10-202(1)(a), 44-10-202(1)(c), 44-10-202(6), 44-10-203(2)(f), 44- 10-203(1)(k), 44-10-203(3)(a)-(b), C.R.S.Rule was revised to remove transfer restrictions to testing facilities.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 3-1025(B)(2) (a) & 1 CCR 212-3 3-1025 (B)(2)(b)Packaging and Labeling: Minimum Requirements for Test Batch Transfers to a Regulated Marijuana Testing FacilityRevision44-10-202(1)(a), 44-10-202(1)(c), 44-10-202(6), 44-10-203(2)(f), 44- 10-203(1)(k), 44-10-203(3)(a)-(b), C.R.S.Rule was revised to add "Regulated Marijuana" for clarity.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 3-1025(C)(2) (d)Packaging and Labeling: Minimum Requirements for Test Batch Transfers to a Regulated Marijuana Testing FacilityRevision44-10-202(1)(a), 44-10-202(1)(c), 44-10-202(6), 44-10-203(2)(f), 44- 10-203(1)(k), 44-10-203(3)(a)-(b), C.R.S.Rule was revised to add labeling requirement to include at least Active THC.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 3-1025(D)(2) (a) & 1 CCR 212-3 3-1025 (D)(2)(b)Packaging and Labeling: Minimum Requirements for Test Batch Transfers to a Regulated Marijuana Testing FacilityRevision44-10-202(1)(a), 44-10-202(1)(c), 44-10-202(6), 44-10-203(2)(f), 44- 10-203(1)(k), 44-10-203(3)(a)-(b), C.R.S.Rules were revised to add "Regulated Marijuana flower or trim" for clarity.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 4-210(A)(2) (b)Regulated Marijuana Testing Program: Potency TestingRevision44-10-202(1)(c), 44-10-203(1)(a), 44-10-203(1)(c), 44-10-203(1)(g), 44-10-203(1)(k), 44-10-203(2)(d), 44-10-203(2)(f), 44-10-203(3)(d), 44-10-203(3)(e), 44-10-501(6), 44- 10-502(3), 44-10-503(8), 44-10- 504(1)(b), 44-10-504(2), 44-10- 601(4), 44-10-602(4), 44-10-603 (6), 44-10-604(1)(b), and 44-10- 604(2), C.R.S. Authority also exists in the Colorado Constitution at Article XVIII, Subsection 16(5)(a)(VII).Rule was revised to replace "THC" with "Cannabinoid".MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 4-210(E)(4) (b) & 1 CCR 212-3 4-210 (E)(4)(c)Regulated Marijuana Testing Program: Potency TestingRevision44-10-202(1)(c), 44-10-203(1)(a), 44-10-203(1)(c), 44-10-203(1)(g), 44-10-203(1)(k), 44-10-203(2)(d), 44-10-203(2)(f), 44-10-203(3)(d), 44-10-203(3)(e), 44-10-501(6), 44- 10-502(3), 44-10-503(8), 44-10- 504(1)(b), 44-10-504(2), 44-10- 601(4), 44-10-602(4), 44-10-603 (6), 44-10-604(1)(b), and 44-10- 604(2), C.R.S. Authority also exists in the Colorado Constitution at Article XVIII, Subsection 16(5)(a)(VII).Rule was revised to add "Active" before "THC" to align with the new definition.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 4-210(F)(1)Regulated Marijuana Testing Program: Potency TestingRevision44-10-202(1)(c), 44-10-203(1)(a), 44-10-203(1)(c), 44-10-203(1)(g), 44-10-203(1)(k), 44-10-203(2)(d), 44-10-203(2)(f), 44-10-203(3)(d), 44-10-203(3)(e), 44-10-501(6), 44- 10-502(3), 44-10-503(8), 44-10- 504(1)(b), 44-10-504(2), 44-10- 601(4), 44-10-602(4), 44-10-603 (6), 44-10-604(1)(b), and 44-10- 604(2), C.R.S. Authority also exists in the Colorado Constitution at Article XVIII, Subsection 16(5)(a)(VII).Rule was revised to remove restrictions on testing of multiple strain Harvest Batches for Pre-Rolls.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 4-215(B)(1) - Table, 1 CCR 212-3 4-225 (F)(4)(c)(iv)Regulated Marijuana Testing Program: Contaminant Testing Regulated Marijuana Testing Program: Sampling ProceduresRevision44-10-202(1)(c), 44-10-203(1)(a), 44-10-203(1)(c), 44-10-203(1)(g), 44-10-203(1)(k), 44-10-203(2)(d), 44-10-203(2)(f), 44-10-203(3)(d), 44-10-203(3)(e), 44-10-501(6), 44- 10-502(3), 44-10-503(8), 44-10- 504(1)(b), 44-10-504(2), 44-10- 601(4), 44-10-602(4), 44-10-603 (6), 44-10-604(1)(b), and 44-10- 604(2), C.R.S. Authority also exists in the Colorado Constitution at Article XVIII, Subsection 16(5)(a)(VII). and 44-10-202(1)(c), 44-10-203(1)(a), 44-10-203(1)(c), 44-10-203(1)(g), 44-10-203(1)(k), 44-10-203(2)(d), 44-10-203(2)(f), 44-10-203(3)(d), 44-10-203(3)(e), 44-10-501(6), 44- 10-502(3), 44-10-503(8), 44-10- 504(1)(b), 44-10-504(2), 44-10- 601(4), 44-10-602(4), 44-10-603 (6), 44-10-604(1)(b), and 44-10- 604(2), C.R.S. Authority also exists in the Colorado Constitution at Article XVIII, Subsection 16(5)(a)(VII).Rule was revised to replace "pre-roll" with "Pre-rolled Marijuana & Infused Pre-Rolled Marijuana" for clarity.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 4-215(C)(1) - TableRegulated Marijuana Testing Program: Contaminant TestingRevision44-10-202(1)(c), 44-10-203(1)(a), 44-10-203(1)(c), 44-10-203(1)(g), 44-10-203(1)(k), 44-10-203(2)(d), 44-10-203(2)(f), 44-10-203(3)(d), 44-10-203(3)(e), 44-10-501(6), 44- 10-502(3), 44-10-503(8), 44-10- 504(1)(b), 44-10-504(2), 44-10- 601(4), 44-10-602(4), 44-10-603 (6), 44-10-604(1)(b), and 44-10- 604(2), C.R.S. Authority also exists in the Colorado Constitution at Article XVIII, Subsection 16(5)(a)(VII).Rule was revised to add "*Water or Heat/Pressure-Based Concentrate will only need to be tested for mycotoxins if the WWP used to create the concentrate was not tested for microbial contaminants" for clarity".MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 4-215(D)(1) - TableRegulated Marijuana Testing Program: Contaminant TestingRevision44-10-202(1)(c), 44-10-203(1)(a), 44-10-203(1)(c), 44-10-203(1)(g), 44-10-203(1)(k), 44-10-203(2)(d), 44-10-203(2)(f), 44-10-203(3)(d), 44-10-203(3)(e), 44-10-501(6), 44- 10-502(3), 44-10-503(8), 44-10- 504(1)(b), 44-10-504(2), 44-10- 601(4), 44-10-602(4), 44-10-603 (6), 44-10-604(1)(b), and 44-10- 604(2), C.R.S. Authority also exists in the Colorado Constitution at Article XVIII, Subsection 16(5)(a)(VII).Rule was revised to clarify residual solvents testing in Hemp products is a "Yes".MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 4-215(E)(3)Regulated Marijuana Testing Program: Contaminant TestingRevision44-10-202(1)(c), 44-10-203(1)(a), 44-10-203(1)(c), 44-10-203(1)(g), 44-10-203(1)(k), 44-10-203(2)(d), 44-10-203(2)(f), 44-10-203(3)(d), 44-10-203(3)(e), 44-10-501(6), 44- 10-502(3), 44-10-503(8), 44-10- 504(1)(b), 44-10-504(2), 44-10- 601(4), 44-10-602(4), 44-10-603 (6), 44-10-604(1)(b), and 44-10- 604(2), C.R.S. Authority also exists in the Colorado Constitution at Article XVIII, Subsection 16(5)(a)(VII).Rule was revised to add "and Hemp Products", and to make reference to substances to be tested more general. Finally, updated the note that not all solvents in the table are approved for use.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 4-215(E)(5) & 1 CCR 212-3 4-225(F) (2)Regulated Marijuana Testing Program: Contaminant Testing Regulated Marijuana Testing Program: Sampling ProceduresRevision44-10-202(1)(c), 44-10-203(1)(a), 44-10-203(1)(c), 44-10-203(1)(g), 44-10-203(1)(k), 44-10-203(2)(d), 44-10-203(2)(f), 44-10-203(3)(d), 44-10-203(3)(e), 44-10-501(6), 44- 10-502(3), 44-10-503(8), 44-10- 504(1)(b), 44-10-504(2), 44-10- 601(4), 44-10-602(4), 44-10-603 (6), 44-10-604(1)(b), and 44-10- 604(2), C.R.S. Authority also exists in the Colorado Constitution at Article XVIII, Subsection 16(5)(a)(VII). and 44-10-202(1)(c), 44-10-203(1)(a), 44-10-203(1)(c), 44-10-203(1)(g), 44-10-203(1)(k), 44-10-203(2)(d), 44-10-203(2)(f), 44-10-203(3)(d), 44-10-203(3)(e), 44-10-501(6), 44- 10-502(3), 44-10-503(8), 44-10- 504(1)(b), 44-10-504(2), 44-10- 601(4), 44-10-602(4), 44-10-603 (6), 44-10-604(1)(b), and 44-10- 604(2), C.R.S. Authority also exists in the Colorado Constitution at Article XVIII, Subsection 16(5)(a)(VII).Rule was revised to add "flower, trim, shake, and wet whole plant" for clarity and compliance.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 4-215(J)(5) (a)(i)Regulated Marijuana Testing Program: Contaminant TestingRevision44-10-202(1)(c), 44-10-203(1)(a), 44-10-203(1)(c), 44-10-203(1)(g), 44-10-203(1)(k), 44-10-203(2)(d), 44-10-203(2)(f), 44-10-203(3)(d), 44-10-203(3)(e), 44-10-501(6), 44- 10-502(3), 44-10-503(8), 44-10- 504(1)(b), 44-10-504(2), 44-10- 601(4), 44-10-602(4), 44-10-603 (6), 44-10-604(1)(b), and 44-10- 604(2), C.R.S. Authority also exists in the Colorado Constitution at Article XVIII, Subsection 16(5)(a)(VII).Rule was revised to add rule reference to 4-240 (C)(3) for clarity.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 4-215(J)(6) (a)(ii)Regulated Marijuana Testing Program: Contaminant TestingRevision44-10-202(1)(c), 44-10-203(1)(a), 44-10-203(1)(c), 44-10-203(1)(g), 44-10-203(1)(k), 44-10-203(2)(d), 44-10-203(2)(f), 44-10-203(3)(d), 44-10-203(3)(e), 44-10-501(6), 44- 10-502(3), 44-10-503(8), 44-10- 504(1)(b), 44-10-504(2), 44-10- 601(4), 44-10-602(4), 44-10-603 (6), 44-10-604(1)(b), and 44-10- 604(2), C.R.S. Authority also exists in the Colorado Constitution at Article XVIII, Subsection 16(5)(a)(VII).Rule was revised to remove "if a solvent was used" from Hemp Product requirements for clarity.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 4-215(J)(6) (a) 1 - TableRegulated Marijuana Testing Program: Contaminant TestingRevision44-10-202(1)(c), 44-10-203(1)(a), 44-10-203(1)(c), 44-10-203(1)(g), 44-10-203(1)(k), 44-10-203(2)(d), 44-10-203(2)(f), 44-10-203(3)(d), 44-10-203(3)(e), 44-10-501(6), 44- 10-502(3), 44-10-503(8), 44-10- 504(1)(b), 44-10-504(2), 44-10- 601(4), 44-10-602(4), 44-10-603 (6), 44-10-604(1)(b), and 44-10- 604(2), C.R.S. Authority also exists in the Colorado Constitution at Article XVIII, Subsection 16(5)(a)(VII).Rule was revised to add an effective through date June 30, 2026.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 4-215(J)(6) (a) 1 - NoteRegulated Marijuana Testing Program: Contaminant TestingRevision44-10-202(1)(c), 44-10-203(1)(a), 44-10-203(1)(c), 44-10-203(1)(g), 44-10-203(1)(k), 44-10-203(2)(d), 44-10-203(2)(f), 44-10-203(3)(d), 44-10-203(3)(e), 44-10-501(6), 44- 10-502(3), 44-10-503(8), 44-10- 504(1)(b), 44-10-504(2), 44-10- 601(4), 44-10-602(4), 44-10-603 (6), 44-10-604(1)(b), and 44-10- 604(2), C.R.S. Authority also exists in the Colorado Constitution at Article XVIII, Subsection 16(5)(a)(VII).Rule was revised to the correct rule citation and added "or in Hemp Products" for additional clarity.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 4-215(J)(6) (a) 2 - Table & NoteRegulated Marijuana Testing Program: Contaminant TestingNew44-10-202(1)(c), 44-10-203(1)(a), 44-10-203(1)(c), 44-10-203(1)(g), 44-10-203(1)(k), 44-10-203(2)(d), 44-10-203(2)(f), 44-10-203(3)(d), 44-10-203(3)(e), 44-10-501(6), 44- 10-502(3), 44-10-503(8), 44-10- 504(1)(b), 44-10-504(2), 44-10- 601(4), 44-10-602(4), 44-10-603 (6), 44-10-604(1)(b), and 44-10- 604(2), C.R.S. Authority also exists in the Colorado Constitution at Article XVIII, Subsection 16(5)(a)(VII).A new table was created to align with hemp testing requirements with an effective date July 1, 2026.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 4-215(J)(7) (a) - Table & 1 CCR 212-3 4-215(J)(7)(c) - TableRegulated Marijuana Testing Program: Contaminant TestingRevision44-10-202(1)(c), 44-10-203(1)(a), 44-10-203(1)(c), 44-10-203(1)(g), 44-10-203(1)(k), 44-10-203(2)(d), 44-10-203(2)(f), 44-10-203(3)(d), 44-10-203(3)(e), 44-10-501(6), 44- 10-502(3), 44-10-503(8), 44-10- 504(1)(b), 44-10-504(2), 44-10- 601(4), 44-10-602(4), 44-10-603 (6), 44-10-604(1)(b), and 44-10- 604(2), C.R.S. Authority also exists in the Colorado Constitution at Article XVIII, Subsection 16(5)(a)(VII).The table was revised for clarity of testing requirements by adding "Chromium".MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 4-220 Basis & Purpose, 1 CCR 212-3 4-220(A), 1 CCR 212-3 4- 220(A)(1), 1 CCR 212-3 4-220(A)(1)(b), 1 CCR 212-3 4-220(A)(2)(a), 1 CCR 212-3 4-220(A)(2) 9b), 1 CCR 212-3 4-220 (A)(2)(b)(ii) & 1 CCR 212- 3 4-225(B)(3)Regulated Marijuana Testing Program: R&D Testing Regulated Marijuana Testing Program: Sampling ProceduresRevision44-10-202(1)(c), 44-10-203(1)(a), 44-10-203(1)(c), 44-10-203(1)(g), 44-10-203(1)(k), 44-10-203(2)(d), 44-10-203(2)(f), 44-10-203(3)(d), 44-10-203(3)(e), 44-10-501(6), 44- 10-502(3), 44-10-503(8), 44-10- 504(1)(b), 44-10-504(2), 44-10- 601(4), 44-10-602(4), 44-10-603 (6), 44-10-604(1)(b), and 44-10- 604(2), C.R.S. Authority also exists in the Colorado Constitution at Article XVIII, Subsection 16(5)(a)(VII). and 44-10-202(1)(c), 44-10-203(1)(a), 44-10-203(1)(c), 44-10-203(1)(g), 44-10-203(1)(k), 44-10-203(2)(d), 44-10-203(2)(f), 44-10-203(3)(d), 44-10-203(3)(e), 44-10-501(6), 44- 10-502(3), 44-10-503(8), 44-10- 504(1)(b), 44-10-504(2), 44-10- 601(4), 44-10-602(4), 44-10-603 (6), 44-10-604(1)(b), and 44-10- 604(2), C.R.S. Authority also exists in the Colorado Constitution at Article XVIII, Subsection 16(5)(a)(VII).Rule was revised to replace "R&D" with "Research & Development" to distinguish it from new R-and-D Units.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 4-225(F)(4) (c)(iv) - TableRegulated Marijuana Testing Program: Sampling ProceduresRevision44-10-202(1)(c), 44-10-203(1)(a), 44-10-203(1)(c), 44-10-203(1)(g), 44-10-203(1)(k), 44-10-203(2)(d), 44-10-203(2)(f), 44-10-203(3)(d), 44-10-203(3)(e), 44-10-501(6), 44- 10-502(3), 44-10-503(8), 44-10- 504(1)(b), 44-10-504(2), 44-10- 601(4), 44-10-602(4), 44-10-603 (6), 44-10-604(1)(b), and 44-10- 604(2), C.R.S. Authority also exists in the Colorado Constitution at Article XVIII, Subsection 16(5)(a)(VII).Table was revised for clarity of testing requirements.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 4-230(A) - TableRegulated Marijuana Testing Program: Reduced Testing Allowance ProceduresRevision44-10-202(1)(c), 44-10-203(1)(a), 44-10-203(1)(c), 44-10-203(1)(g), 44-10-203(1)(k), 44-10-203(2)(d), 44-10-203(2)(f), 44-10-203(3)(d), 44-10-203(3)(e), 44-10-501(6), 44- 10-502(3), 44-10-503(8), 44-10- 504(1)(b), 44-10-504(2), 44-10- 601(4), 44-10-602(4), 44-10-603 (6), 44-10-604(1)(b), and 44-10- 604(2), C.R.S. Authority also exists in the Colorado Constitution at Article XVIII, Subsection 16(5)(a)(VII).Rule was revised to clarify "Scope of products that must be tested to qualify for RTA" to "Scope of products that must pass testing to qualify for RTA". Rule was also revised to add "water Activity" to testing for Regulated Marijuana. Finally, the rule was revised to add "Pesticides, Elemental Impurities" to Wet Whole Plant for clarity.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 4-230(B)(2)Regulated Marijuana Testing Program: Reduced Testing Allowance ProceduresRevision44-10-202(1)(c), 44-10-203(1)(a), 44-10-203(1)(c), 44-10-203(1)(g), 44-10-203(1)(k), 44-10-203(2)(d), 44-10-203(2)(f), 44-10-203(3)(d), 44-10-203(3)(e), 44-10-501(6), 44- 10-502(3), 44-10-503(8), 44-10- 504(1)(b), 44-10-504(2), 44-10- 601(4), 44-10-602(4), 44-10-603 (6), 44-10-604(1)(b), and 44-10- 604(2), C.R.S. Authority also exists in the Colorado Constitution at Article XVIII, Subsection 16(5)(a)(VII).Rule was revised to add "different hardware (such as different cartridge size, design, volume, or manufacturer) ) or" to the rule for clarity.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 4-230(D)(1) (a)(i) & 1 CCR 212-3 4- 230(D)(2)(a)(i)Regulated Marijuana Testing Program: Reduced Testing Allowance ProceduresRevision44-10-202(1)(c), 44-10-203(1)(a), 44-10-203(1)(c), 44-10-203(1)(g), 44-10-203(1)(k), 44-10-203(2)(d), 44-10-203(2)(f), 44-10-203(3)(d), 44-10-203(3)(e), 44-10-501(6), 44- 10-502(3), 44-10-503(8), 44-10- 504(1)(b), 44-10-504(2), 44-10- 601(4), 44-10-602(4), 44-10-603 (6), 44-10-604(1)(b), and 44-10- 604(2), C.R.S. Authority also exists in the Colorado Constitution at Article XVIII, Subsection 16(5)(a)(VII).Rule was revised to replace "THC" with "Cannabinoid".MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 4-230(G) - TableRegulated Marijuana Testing Program: Reduced Testing Allowance ProceduresRevision44-10-202(1)(c), 44-10-203(1)(a), 44-10-203(1)(c), 44-10-203(1)(g), 44-10-203(1)(k), 44-10-203(2)(d), 44-10-203(2)(f), 44-10-203(3)(d), 44-10-203(3)(e), 44-10-501(6), 44- 10-502(3), 44-10-503(8), 44-10- 504(1)(b), 44-10-504(2), 44-10- 601(4), 44-10-602(4), 44-10-603 (6), 44-10-604(1)(b), and 44-10- 604(2), C.R.S. Authority also exists in the Colorado Constitution at Article XVIII, Subsection 16(5)(a)(VII).Rule was revised to remove "microbial only" from wet whole plant" testing for clarity and compliance.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 4-230(M)(1)Regulated Marijuana Testing Program: Reduced Testing Allowance ProceduresRevision44-10-202(1)(c), 44-10-203(1)(a), 44-10-203(1)(c), 44-10-203(1)(g), 44-10-203(1)(k), 44-10-203(2)(d), 44-10-203(2)(f), 44-10-203(3)(d), 44-10-203(3)(e), 44-10-501(6), 44- 10-502(3), 44-10-503(8), 44-10- 504(1)(b), 44-10-504(2), 44-10- 601(4), 44-10-602(4), 44-10-603 (6), 44-10-604(1)(b), and 44-10- 604(2), C.R.S. Authority also exists in the Colorado Constitution at Article XVIII, Subsection 16(5)(a)(VII).The MED Address was updated to reflect the move to a different suite.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 4-240(B)Regulated Marijuana Testing Program: Contaminated Product and Failed Test Results and ProceduresRevision44-10-202(1)(c), 44-10-203(1)(a), 44-10-203(1)(c), 44-10-203(1)(g), 44-10-203(1)(k), 44-10-203(2)(d), 44-10-203(2)(f), 44-10-203(3)(d), 44-10-203(3)(e), 44-10-501(6), 44- 10-502(3), 44-10-503(8), 44-10- 504(1)(b), 44-10-504(2), 44-10- 601(4), 44-10-602(4), 44-10-603 (6), 44-10-604(1)(b), and 44-10- 604(2), C.R.S. Authority also exists in the Colorado Constitution at Article XVIII, Subsection 16(5)(a)(VII).Rule was revised to remove reference to pesticide testing to new rule 4-240(B.5).MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 4-240(B.5)Regulated Marijuana Testing Program: Contaminated Product and Failed Test Results and ProceduresNew44-10-202(1)(c), 44-10-203(1)(a), 44-10-203(1)(c), 44-10-203(1)(g), 44-10-203(1)(k), 44-10-203(2)(d), 44-10-203(2)(f), 44-10-203(3)(d), 44-10-203(3)(e), 44-10-501(6), 44- 10-502(3), 44-10-503(8), 44-10- 504(1)(b), 44-10-504(2), 44-10- 601(4), 44-10-602(4), 44-10-603 (6), 44-10-604(1)(b), and 44-10- 604(2), C.R.S. Authority also exists in the Colorado Constitution at Article XVIII, Subsection 16(5)(a)(VII).New Rule for Failed Pesticide contamination Testing (removed from 4-240(B)).MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 4-240(C)(2) (a)(ii)Regulated Marijuana Testing Program: Contaminated Product and Failed Test Results and ProceduresRevision44-10-202(1)(c), 44-10-203(1)(a), 44-10-203(1)(c), 44-10-203(1)(g), 44-10-203(1)(k), 44-10-203(2)(d), 44-10-203(2)(f), 44-10-203(3)(d), 44-10-203(3)(e), 44-10-501(6), 44- 10-502(3), 44-10-503(8), 44-10- 504(1)(b), 44-10-504(2), 44-10- 601(4), 44-10-602(4), 44-10-603 (6), 44-10-604(1)(b), and 44-10- 604(2), C.R.S. Authority also exists in the Colorado Constitution at Article XVIII, Subsection 16(5)(a)(VII).Rule was revised to add "Decontaminate and test in accordance with this subparagraph (C)(2)" for clarity and compliance.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 5-225(A)(1) (a)Medical Marijuana Cultivation Facility: Production ManagementRepeal44-10-202(1)(c), 44-10-203(1)(k), 44-10-203(5), 44-10-401(2)(a)(II), 44-10-502, C.R.S.Rule was repealed.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 5-225(C)(3)Medical Marijuana Cultivation Facility: Production ManagementNew44-10-202(1)(c), 44-10-203(1)(k), 44-10-203(5), 44-10-401(2)(a)(II), 44-10-502, C.R.S.New rule for mixed cultivation facilities to allow for on hand inventory.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 5-230(A)Medical Marijuana Cultivation Facility: Sampling Unit ProtocolsRevision44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-401(2)(a) (II), and 44-10-502(5), C.R.S.Rule was revised to allow R-and-D Units to any employee designated to receive R-and-D Units in the Inventory Tracking System (ITS).MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 5-230(A)(5)Medical Marijuana Cultivation Facility: Sampling Unit ProtocolsRevision44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-401(2)(a) (II), and 44-10-502(5), C.R.S.Rule was revised to add Standard Operating Procedures (SOP) requirements for internal written experimental proposal.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 5-230(B)(1) & 1 CCR 212-3 5-230(B) (2)Medical Marijuana Cultivation Facility: Sampling Unit ProtocolsRepeal44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-401(2)(a) (II), and 44-10-502(5), C.R.S.Rule was repealed in accordance to HB 25-1209.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 5-230(B)(3) & 1 CCR 212-3 5-230(B) (4)Medical Marijuana Cultivation Facility: Sampling Unit ProtocolsNew44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-401(2)(a) (II), and 44-10-502(5), C.R.S.A new rule was added for R-and-D Unit Testing requirements, including how the addition of flavors and non-marijuana ingredients works.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 5-230(C)(3)Medical Marijuana Cultivation Facility: Sampling Unit ProtocolsNew44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-401(2)(a) (II), and 44-10-502(5), C.R.S.Rule was relabeled to "R-and-D Unit Transfer Limits". Additionally, rules were made (a) pertaining to monthly limits and (b) pertaining to daily sales limits in accordance with HB 25-1209.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 5-230(C)(7)Medical Marijuana Cultivation Facility: Sampling Unit ProtocolsNew44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-401(2)(a) (II), and 44-10-502(5), C.R.S.A new rule was added that clarifies an employee is not required to accept a R-and-D Unit.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 5-230(D)(2)Medical Marijuana Cultivation Facility: Sampling Unit ProtocolsNew44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-401(2)(a) (II), and 44-10-502(5), C.R.S.A new rule was added to clarify that a Licensee may not receive compensation for a R-and-D Unit.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 5-230(G)Medical Marijuana Cultivation Facility: Ability to Change Designation of Regulated MarijuanaRepeal44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-401(2)(a) (II), and 44-10-502(5), C.R.S.Rule was repealed in accordance to HB 25-1209.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 5-305 Basis & PurposeMedical Marijuana Products Manufacturer: License PrivilegesRevision44-10-202(1)(c), 44-10-203(1)(k), 44-10-203(1)(m), 44-10-203(2)(d) (I)-(VI), 44-10-313(14), and 44-10- 503, C.R.S.Basis and Purpose was revised to add new statutory section 44-10-203(1)(m).MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 5-310(A)Medical Marijuana Products Manufacturer: General Limitations or Prohibited ActsRevision44-10-202(1)(c), 44-10-203(1)(k), 44-10-401(2)(a)(III), and 44-10- 503, C.R.S.Rule was revised to remove the requirement for contracts to be current and available on the Licensed Premises and reference to 3-905 in accordance with HB 25-1209.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 5-315(B)(1)Medical Marijuana Products Manufacturer: Medical Marijuana Concentrate ProductionRevision44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-203(2)(i), 44-10-401(2)(a)(III), and 44-10- 503, C.R.S.Rule was revised to remove "current" and reference to 3-905 in accordance with HB 25-1209.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 5-315(B)(7) (b) & 1 CCR 212-3 5-315 (B)(7)(c)Medical Marijuana Products Manufacturer: Medical Marijuana Concentrate ProductionRevision44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-203(2)(i), 44-10-401(2)(a)(III), and 44-10- 503, C.R.S.Rule was revised to remove reference to 3-905 and to incorporate requirements from (c).MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 5-315(B)(7) (c)Medical Marijuana Products Manufacturer: Medical Marijuana Concentrate ProductionRepeal44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-203(2)(i), 44-10-401(2)(a)(III), and 44-10- 503, C.R.S.Rule was repealed and incorporated into 5-315(B) (7)(b).MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 5-315(B)(8)Medical Marijuana Products Manufacturer: Medical Marijuana Concentrate ProductionRepeal44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-203(2)(i), 44-10-401(2)(a)(III), and 44-10- 503, C.R.S.Rule was repealed in accordance to HB 25-1209.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 5-315(D)(1) (f)Medical Marijuana Products Manufacturer: Medical Marijuana Concentrate ProductionRepeal44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-203(2)(i), 44-10-401(2)(a)(III), and 44-10- 503, C.R.S.Rule was repealed in accordance to HB 25-1209.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 5-320(A)Medical Marijuana Products Manufacturer: R-and-D Unit ProtocolsRevision44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-401(2)(a) (III), and 44-10-503 C.R.S.Rule was revised to allow R-and-D Units to any employee designated to receive R-and-D Units in the Inventory Tracking System.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 5-320(A)(5)Medical Marijuana Products Manufacturer: R-and-D Unit ProtocolsNew44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-401(2)(a) (III), and 44-10-503 C.R.S.A new rule was added for SOP requirements for internal written experimental proposal.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 5-320(B)(1), 1 CCR 212-3 5-320(B)(2), & 1 CCR 212-3 5-320(B) (3)Medical Marijuana Products Manufacturer: R-and-D Unit ProtocolsRepeal44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-401(2)(a) (III), and 44-10-503 C.R.S.Rule was repealed in accordance to HB 25-1209.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 5-320(B)(4) & 1 CCR 212-3 5-320(B) (5)Medical Marijuana Products Manufacturer: R-and-D Unit ProtocolsNew44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-401(2)(a) (III), and 44-10-503 C.R.S.A new rule was added for R-and-D Unit Testing requirements, including how the addition of flavors and non-marijuana ingredients works.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 5-320(C)(3)Medical Marijuana Products Manufacturer: R-and-D Unit ProtocolsNew44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-401(2)(a) (III), and 44-10-503 C.R.S.Rule was relabeled to "R-and-D Unit Transfer Limits". Additionally, rules were made (a) pertaining to monthly limits and (b) pertaining to daily sales limits in accordance with HB 25-1209.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 5-320(C)(7)Medical Marijuana Products Manufacturer: R-and-D Unit ProtocolsNew44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-401(2)(a) (III), and 44-10-503 C.R.S.A new rule was added to clarify that an employee is not required to accept a R-and-D Unit.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 5-320(D)(2)Medical Marijuana Products Manufacturer: R-and-D Unit ProtocolsNew44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-401(2)(a) (III), and 44-10-503 C.R.S.A new rule was added to clarify that a Licensee may not receive compensation for a R-and-D Unit.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 5-320(G)Medical Marijuana Products Manufacturer: R-and-D Unit ProtocolsRepeal44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-401(2)(a) (III), and 44-10-503 C.R.S.Rule was repealed in accordance to HB 25-1209.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 5-415(C)(6)Medical Marijuana Testing Facilities: Certification RequirementsRevision44-10-202(1)(c), 44-10-203(2)(h), 44-10-203(1)(a), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-203(2)(d), 44-10-203(2)(f)(II), 44-10-203(2) (f)(IV), 44-10-203(3)(d), 44-10- 203(3)(e), 44-10-313(8)(a), 44-10- 401(2)(a)(IV), and 44-10-504, C.R. S.Rule was revised to add "if required by the Division" for clarity and compliance.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 5-420(D)(3)Medical Marijuana Testing Facilities: PersonnelRevision44-10-202(1)(c), 44-10-203(2)(h), 44-10-203(1)(a), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-203(2)(d), 44-10-203(2)(f)(II), 44-10-203(2) (f)(IV), 44-10-203(3)(d), 44-10- 203(3)(e), 44-10-313(8)(a), 44-10- 401(2)(a)(IV), and 44-10-504, C.R. S.Revised the rule to include the process for submitting a waiver for an additional 60 days to appoint a permanent laboratory director.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 5-420(D)(4)Medical Marijuana Testing Facilities: PersonnelRepeal44-10-202(1)(c), 44-10-203(2)(h), 44-10-203(1)(a), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-203(2)(d), 44-10-203(2)(f)(II), 44-10-203(2) (f)(IV), 44-10-203(3)(d), 44-10- 203(3)(e), 44-10-313(8)(a), 44-10- 401(2)(a)(IV), and 44-10-504, C.R. S.Repealed the rule related to submitting a waiver for additional time to hire a permanent laboratory director.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 5-430(I)(10)Medical Marijuana Testing Facilities: Analytical ProcessesRevision44-10-203(2)(d), 44-10-401(2)(a) (IV), and 44-10-504, C.R.S.Rule was reworded for clarity.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 5-430(M)(1), 1 CCR 212-3 5-430(M)(2), 1 CCR 212-3 5-430(M)(3), 1 CCR 212-3 5-430(M)(4), 1 CCR 212-3 5-430(M)(5), 1 CCR 212-3 5-430(M)(6) & 1 CCR 212-3 5-430(M) (7)Medical Marijuana Testing Facilities: Analytical ProcessesRevision44-10-203(2)(d), 44-10-401(2)(a) (IV), and 44-10-504, C.R.S.Rule was revised to remove "recovery" and add "a variance of" for clarity.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 5-435(A)Medical Marijuana Testing Facilities: Proficiency TestingRevision44-10-203(2)(d), 44-10-401(2)(a) (IV), and 44-10-504, C.R.S.Rule was revised to add "if required by the Division" for clarity and compliance.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 5-505(E)(1) & 1 CCR 212-3 5-505(E) (2)Medical Marijuana Transporter: License PrivilegesRepeal44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-203(2)(h), 44-10-203(2)(n), 44-10-203(3)(c), 44-10-313(14), 44-10-401(2)(a) (V), 44-10-505, C.R.S.Repealed subparagraph (1) and updated subparagraph (2) by striking the effective date.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 5-715(A)(2) (f) & 1 CCR 212-3 5-715 (A)(3)(e)Marijuana Research and Development Facility: Project ApprovalRepeal44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-203(1)(i), 44-10-203(2)(s), 44-10-401(1)(a) (VII), and 44-10-507, C.R.S.Rules were repealed in accordance to HB 25-1209.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-100 Series - TitleRetail Marijuana StoresRevision44-10-202(1)(c), 44-10-203(1)(k), 44-10-203(2)(aa), 44-10-401(2)(b) (I), 44-10-401(2)(b)(XI), 44-10- 601, and 44-10-611, C.R.S.Rule title was revised to include Accelerator Stores to the seriesMED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-101Retail Marijuana Store and Accelerator Store InterchangeableNew44-10-202(1)(c), 44-10-203(1)(k), 44-10-203(2)(aa), 44-10-401(2)(b) (I), 44-10-401(2)(b)(XI), 44-10- 601, and 44-10-611, C.R.S.New rule clarifying that the definition of Retail Marijuana Store includes Accelerator Store.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-105(A)(2)Retail Marijuana Store: License PrivilegesNew44-10-202(1)(c), 44-10-203(1)(k), 44-10-203(2)(aa), 44-10-203(2) (dd), 44-10-313(14), 44-10-401(2) (b)(I), 44-10-401(2)(b)(XI), 44-10- 601, and 44-10-605, and 44-10- 611, C.R.S.A new rule was added clarifying that a shared Licensed Premises between Retail Marijuana Stores and Accelerator Stores are permitted.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-105(A)(3)Retail Marijuana Store: License PrivilegesNew44-10-202(1)(c), 44-10-203(1)(k), 44-10-203(2)(aa), 44-10-203(2) (dd), 44-10-313(14), 44-10-401(2) (b)(I), 44-10-401(2)(b)(XI), 44-10- 601, and 44-10-605, and 44-10- 611, C.R.S.A new rule was added clarifying that a separate Licensed Premises with an Accelerator-Endorsed Retail Marijuana Store and Accelerator Store are permitted.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-105(A)(4)Retail Marijuana Store: License PrivilegesNew44-10-202(1)(c), 44-10-203(1)(k), 44-10-203(2)(aa), 44-10-203(2) (dd), 44-10-313(14), 44-10-401(2) (b)(I), 44-10-401(2)(b)(XI), 44-10- 601, and 44-10-605, and 44-10- 611, C.R.S.A new rule was added clarifying that a shared Licensed Premises and operational separation with an Accelerator-Endorsed Retail Marijuana Store and Accelerator Store are permitted.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-105(H)(1) & 1 CCR 212-3 6-105(H) (2)Retail Marijuana Store: License PrivilegesRepeal44-10-202(1)(c), 44-10-203(1)(k), 44-10-203(2)(aa), 44-10-203(2) (dd), 44-10-313(14), 44-10-401(2) (b)(I), 44-10-401(2)(b)(XI), 44-10- 601, and 44-10-605, and 44-10- 611, C.R.S.Repealed subparagraph (1) and updated subparagraph (2) by striking the effective date.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-200 Series - TitleRetail Marijuana Cultivation Facilities and Accelerator CultivatorsRevision44-10-202(1)(c), 44-10-203(1)(k), 44-10-203(2)(aa), 44-10-401(2)(b) (II), 44-10-401(2)(b)(VII), 44-10- 602, and 44-10-607, C.R.S.Rule series was revised to add Accelerator Cultivators to the series.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-201Retail Marijuana Cultivation Facility and Accelerator Cultivator InterchangeableNew44-10-202(1)(c), 44-10-203(1)(k), 44-10-203(2)(aa), 44-10-401(2)(b) (II), 44-10-401(2)(b)(VII), 44-10- 602, and 44-10-607, C.R.S.New rule clarifying that the definition of Retail Marijuana Cultivation Facility includes Accelerator CultivatorMED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-205(A.5)Retail Marijuana Cultivation Facility: License PrivilegesNew44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-203(2)(h), 44-10-203(2)(j), 44-10-203(2)(r), 44-10-203(3)(c), 44-10-313(14), 44- 10-401(2)(b)(II), and 44-10- 602, C.R.S.New rules for Licensed Premises - Accelerator CultivatorsMED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-205(A.5) (1)Retail Marijuana Cultivation Facility: License PrivilegesNew44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-203(2)(h), 44-10-203(2)(j), 44-10-203(2)(r), 44-10-203(3)(c), 44-10-313(14), 44- 10-401(2)(b)(II), and 44-10- 602, C.R.S.A new rule was added clarifying that shared Licensed Premises between Accelerator-Endorsed Retail Marijuana Cultivation Facility and Accelerator Cultivator are permitted.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-205(A.5) (2)Retail Marijuana Cultivation Facility: License PrivilegesNew44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-203(2)(h), 44-10-203(2)(j), 44-10-203(2)(r), 44-10-203(3)(c), 44-10-313(14), 44- 10-401(2)(b)(II), and 44-10- 602, C.R.S.A new rule was added clarifying that separate Licensed Premises with Accelerator-Endorsed Retail Marijuana Cultivation Facility and Accelerator Cultivator are permitted.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-205(A.5) (3)Retail Marijuana Cultivation Facility: License PrivilegesNew44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-203(2)(h), 44-10-203(2)(j), 44-10-203(2)(r), 44-10-203(3)(c), 44-10-313(14), 44- 10-401(2)(b)(II), and 44-10- 602, C.R.S.A new rule was added clarifying that shared Licensed Premises and operational separation with Accelerator-Endorsed Retail Marijuana Cultivation Facility and Accelerator Cultivator are permitted.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-220(A)(1)Retail Marijuana Cultivation Facility: Production ManagementRevision44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-203(2) (aa), 44-10-203(6), 44-10-401(2) (b)(II), 44-10-401(2)(b)(VII), 44- 10-602, and 44-10-607, C.R.S.Rule was revised to change the reference from 6-220(A)(2) to 6-220(A)(1.5). Additionally, the rule was revised to reference the collapsing in 6-220 (A)(2).MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-220(A) (1.5)Retail Marijuana Cultivation Facility: Production ManagementNew44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-203(2) (aa), 44-10-203(6), 44-10-401(2) (b)(II), 44-10-401(2)(b)(VII), 44- 10-602, and 44-10-607, C.R.S.New rules for number of Accelerator Cultivators per Licensed PremisesMED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-220(A) (1.5)(a)Retail Marijuana Cultivation Facility: Production ManagementNew44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-203(2) (aa), 44-10-203(6), 44-10-401(2) (b)(II), 44-10-401(2)(b)(VII), 44- 10-602, and 44-10-607, C.R.S.A new rule was added to clarify an Accelerator Cultivator may only own and operate a single Accelerator Cultivation per Licensed Premises.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-220(A) (1.5)(b)Retail Marijuana Cultivation Facility: Production ManagementNew44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-203(2) (aa), 44-10-203(6), 44-10-401(2) (b)(II), 44-10-401(2)(b)(VII), 44- 10-602, and 44-10-607, C.R.S.A new rule was added to clarify that an Accelerator-Endorsed Retail Marijuana Cultivation Facility may host more than one Accelerator Cultivation owned by different social equity licensees at a single Licensed Premises.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-220(C)(3)Retail Marijuana Cultivation Facility: Production ManagementNew44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-203(2) (aa), 44-10-203(6), 44-10-401(2) (b)(II), 44-10-401(2)(b)(VII), 44- 10-602, and 44-10-607, C.R.S.New rule for mixed cultivation facilities to allow for on hand inventory.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-225(A)(4)Retail Marijuana Cultivation Facility: Sampling Unit ProtocolsRevision44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-203(2) (aa), 44-10-401(2)(b)(II), 44-10- 401(2)(b)(VII), 44-10-602(6), and 44-10-607, C.R.S.Rule was revised to add Standard Operating Procedure requirements for internal written experimental proposal.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-225(B)(1) & 1 CCR 212-3 6-225(B) (2)Retail Marijuana Cultivation Facility: Sampling Unit ProtocolsRepeal44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-203(2) (aa), 44-10-401(2)(b)(II), 44-10- 401(2)(b)(VII), 44-10-602(6), and 44-10-607, C.R.S.Rules were repealed in accordance to HB 25-1209.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-225(B)(3) & 1 CCR 212-3 6-225(B) (4)Retail Marijuana Cultivation Facility: Sampling Unit ProtocolsNew44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-203(2) (aa), 44-10-401(2)(b)(II), 44-10- 401(2)(b)(VII), 44-10-602(6), and 44-10-607, C.R.S.A new rule was added for R-and-D Unit Testing requirements, including how the addition of flavors and non-marijuana ingredients works.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-225(D)(3)Retail Marijuana Cultivation Facility: Sampling Unit ProtocolsRevision44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-203(2) (aa), 44-10-401(2)(b)(II), 44-10- 401(2)(b)(VII), 44-10-602(6), and 44-10-607, C.R.S.Rule was relabeled to "R-and-D Unit Transfer Limits". Additionally, rules were made (a) pertaining to monthly limits and (b) pertaining to daily sales limits in accordance with HB 25-1209.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-225(D)(7)Retail Marijuana Cultivation Facility: Sampling Unit ProtocolsNew44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-203(2) (aa), 44-10-401(2)(b)(II), 44-10- 401(2)(b)(VII), 44-10-602(6), and 44-10-607, C.R.S.A new rule was added that clarifies an employee is not required to accept a R-and-D Unit.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-225(E)(2)Retail Marijuana Cultivation Facility: Sampling Unit ProtocolsNew44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-203(2) (aa), 44-10-401(2)(b)(II), 44-10- 401(2)(b)(VII), 44-10-602(6), and 44-10-607, C.R.S.A new rule was added to clarify that a Licensee may not receive compensation for a R-and-D Unit.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-225(H)Retail Marijuana Cultivation Facility: Sampling Unit ProtocolsRepeal44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-203(2) (aa), 44-10-401(2)(b)(II), 44-10- 401(2)(b)(VII), 44-10-602(6), and 44-10-607, C.R.S.Rule was repealed in accordance to HB 25-1209.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-300 Series - TitleRetail Marijuana Products Manufacturing FacilitiesRevision44-10-202(1)(c), 44-10-203(1)(k), 44-10-203(2)(aa), 44-10-401(2)(b) (III), 44-10-401(2)(b)(VIII), 44-10- 603, and 44-10-608, C.R.S.Rule series was revised to add Accelerator Manufacturers to the series.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-301Retail Marijuana Products Manufacturing FacilitiesNew44-10-202(1)(c), 44-10-203(1)(k), 44-10-203(2)(aa), 44-10-401(2)(b) (III), 44-10-401(2)(b)(VIII), 44-10- 603, and 44-10-608, C.R.S.New rule clarifying that the definition of Retail Marijuana Products Manufacturing Facilities includes Accelerator Manufacturers.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-305(A.5)Retail Marijuana Products Manufacturer: License PrivilegesNew44-10-202(1)(c), 44-10-203(1)(a), 44-10-203(2)(d), 44-10-203(2)(f), 44-10-203(2)(g), 44-10-203(2)(i), 44-10-203(2)(y), 44-10-203(2)(aa), 44-10-307(1)(j), 44-10-313(14), 44-10-401(2)(b)(III), 44-10-401(2) (b)(VIII), 44-10-603, and 44-10- 608, C.R.S.New rules for Licensed Premises - Accelerator ManufacturerMED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-305(A.5) (1)Retail Marijuana Products Manufacturer: License PrivilegesNew44-10-202(1)(c), 44-10-203(1)(a), 44-10-203(2)(d), 44-10-203(2)(f), 44-10-203(2)(g), 44-10-203(2)(i), 44-10-203(2)(y), 44-10-203(2)(aa), 44-10-307(1)(j), 44-10-313(14), 44-10-401(2)(b)(III), 44-10-401(2) (b)(VIII), 44-10-603, and 44-10- 608, C.R.S.A new rule was added to clarify that a shared Licensed Premises between Accelerator-Endorsed Retail Marijuana Products Manufacturer and Accelerator Manufacturer is permitted.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-305(A.5) (2)Retail Marijuana Products Manufacturer: License PrivilegesNew44-10-202(1)(c), 44-10-203(1)(a), 44-10-203(2)(d), 44-10-203(2)(f), 44-10-203(2)(g), 44-10-203(2)(i), 44-10-203(2)(y), 44-10-203(2)(aa), 44-10-307(1)(j), 44-10-313(14), 44-10-401(2)(b)(III), 44-10-401(2) (b)(VIII), 44-10-603, and 44-10- 608, C.R.S.A new rule was added to clarify that a separate Licensed Premises with Accelerator-Endorsed Retail Marijuana Products Manufacturer and Accelerator Manufacturer is permitted.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-315(B)(1)Retail Marijuana Products Manufacturer: Retail Marijuana Concentrate ProductionRevision44-10-202(1)(c), 44-10-203(1)(a), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-203(2)(g), 44-10-203(2)(i), 44-10-203(2)(aa), 44-10-401(2)(b) (III), 44-10-401(2)(b)(VIII), 44-10- 603, and 44-10-608, C.R.S.Rule was revised to remove "current" and reference to 3-905.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-315(B)(7) (b)Retail Marijuana Products Manufacturer: Retail Marijuana Concentrate ProductionRevision44-10-202(1)(c), 44-10-203(1)(a), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-203(2)(g), 44-10-203(2)(i), 44-10-203(2)(aa), 44-10-401(2)(b) (III), 44-10-401(2)(b)(VIII), 44-10- 603, and 44-10-608, C.R.S.Rule was revised to remove reference to 3-905 and incorporate requirements from 6-315(B)(7) (c).MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-315(B)(7) (c)Retail Marijuana Products Manufacturer: Retail Marijuana Concentrate ProductionRepeal44-10-202(1)(c), 44-10-203(1)(a), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-203(2)(g), 44-10-203(2)(i), 44-10-203(2)(aa), 44-10-401(2)(b) (III), 44-10-401(2)(b)(VIII), 44-10- 603, and 44-10-608, C.R.S.Rule was repealed and incorporated into 6-315(B) (7)(b).MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-315(B)(8) & 1 CCR 212-3 6-315(D) (1)(f)Retail Marijuana Products Manufacturer: Retail Marijuana Concentrate ProductionRepeal44-10-202(1)(c), 44-10-203(1)(a), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-203(2)(g), 44-10-203(2)(i), 44-10-203(2)(aa), 44-10-401(2)(b) (III), 44-10-401(2)(b)(VIII), 44-10- 603, and 44-10-608, C.R.S.Rules were repealed in accordance to HB 25-1209.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-320(A)(4)Retail Marijuana Products Manufacturer: Sampling Unit ProtocolsRevision44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(2)(d), 44-10-203(1)(k), 44-10-203(2)(h), 44-10-203(2) (aa), 44-10-401(2)(b)(III), 44-10- 401(2)(b)(VIII), 44-10-603(10), and 44-10-608, C.R.S.Rule was revised to add Standard Operating Procedure requirements for internal written experimental proposal.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-320(B)(1), 1 CCR 212-3 6-320(B)(2) & 1 CCR 212-3 6-320(G)Retail Marijuana Products Manufacturer: Sampling Unit ProtocolsRepeal44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(2)(d), 44-10-203(1)(k), 44-10-203(2)(h), 44-10-203(2) (aa), 44-10-401(2)(b)(III), 44-10- 401(2)(b)(VIII), 44-10-603(10), and 44-10-608, C.R.S.Rules were repealed in accordance to HB 25-1209.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-320(B)(3) & 1 CCR 212-3 6-320(B) (4)Retail Marijuana Products Manufacturer: Sampling Unit ProtocolsNew44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(2)(d), 44-10-203(1)(k), 44-10-203(2)(h), 44-10-203(2) (aa), 44-10-401(2)(b)(III), 44-10- 401(2)(b)(VIII), 44-10-603(10), and 44-10-608, C.R.S.A new rule was added for R-and-D Unit Testing requirements, including how the addition of flavors and non-marijuana ingredients works.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-320(C)(3)Retail Marijuana Products Manufacturer: Sampling Unit ProtocolsRevision44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(2)(d), 44-10-203(1)(k), 44-10-203(2)(h), 44-10-203(2) (aa), 44-10-401(2)(b)(III), 44-10- 401(2)(b)(VIII), 44-10-603(10), and 44-10-608, C.R.S.Rule was relabeled to "R-and-D Unit Transfer Limits". Additionally, rules were made (a) pertaining to monthly limits and (b) pertaining to daily sales limits in accordance with HB 25-1209.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-320(C)(7)Retail Marijuana Products Manufacturer: Sampling Unit ProtocolsNew44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(2)(d), 44-10-203(1)(k), 44-10-203(2)(h), 44-10-203(2) (aa), 44-10-401(2)(b)(III), 44-10- 401(2)(b)(VIII), 44-10-603(10), and 44-10-608, C.R.S.A new rule was added to clarify that a Licensee may not receive compensation for a R-and-D Unit.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-415(C)(6)Retail Marijuana Testing Facilities: Certification RequirementsRevision44-10-202(1)(a), 44-10-202(1)(b), 44-10-202(1)(c), 44-10-202(4), 44- 10-203(1)(a), 44-10-203(1)(c), 44- 10-203(1)(k), 44-10-203(2)(c), 44- 10-203(2)(d), 44-10-203(2)(h), 44- 10-203(2)(y), 44-10-203(3)(c), 44- 10-203(3)(d), 44-10-401(2)(b)(IV), and 44-10-604, C.R.S.Rule was revised to add "if required by the Division" for clarity and compliance.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-420(D)(3)Retail Marijuana Testing Facilities: PersonnelRevision44-10-202(1)(a), 44-10-202(1)(b), 44-10-202(1)(c), 44-10-202(4), 44- 10-203(1)(c), 44-10-203(1)(k), 44- 10-203(2)(c), 44-10-203(2)(d), 44- 10-203(3)(c), 44-10-203(3)(d), 44- 10-401(2)(b)(IV), 44-10-604, C.R. S.Revised the rule to include the process for submitting a waiver for an additional 60 days to appoint a permanent laboratory director.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-420(D)(4)Retail Marijuana Testing Facilities: PersonnelRepeal44-10-202(1)(a), 44-10-202(1)(b), 44-10-202(1)(c), 44-10-202(4), 44- 10-203(1)(c), 44-10-203(1)(k), 44- 10-203(2)(c), 44-10-203(2)(d), 44- 10-203(3)(c), 44-10-203(3)(d), 44- 10-401(2)(b)(IV), 44-10-604, C.R. S.Repealed rule related to submitting a waiver for additional time to hire a permanent laboratory directorMED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-425(A)(20)Retail Marijuana Testing Facilities: Standard Operating Procedure ManualRevision44-10-203(1)(c), 44-10-203(1)(k), 44-10-203(2)(d), 44-10-202(4), 44- 10-401(2)(b)(IV), and 44-10-604, C.R.S.Rule was revised for additionally clarity.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-430(I)(10)Retail Marijuana Testing Facilities: Analytical ProcessesRevision44-10-203(1)(c), 44-10-203(1)(k), 44-10-203(2)(d), 44-10-202(4), 44- 10-401(2)(b)(IV), and 44-10-604, C.R.S.Rule was revised for additionally clarity.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-430(M)(1), 1 CCR 212-3 6-430(M)(2), 1 CCR 212-3 6-430(M)(3), 1 CCR 212-3 6-430(M)(4), 1 CCR 212-3 6-430(M)(5), 1 CCR 212-3 6-430(M)(6) & 1 CCR 212-3 6-430(M) (7)Retail Marijuana Testing Facilities: Analytical ProcessesRevision44-10-203(1)(c), 44-10-203(1)(k), 44-10-203(2)(d), 44-10-202(4), 44- 10-401(2)(b)(IV), and 44-10-604, C.R.S.Rule was revised to remove "recovery" and add "a variance of" for clarity.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-430(N)Retail Marijuana Testing Facilities: Analytical ProcessesRevision44-10-203(1)(c), 44-10-203(1)(k), 44-10-203(2)(d), 44-10-202(4), 44- 10-401(2)(b)(IV), and 44-10-604, C.R.S.Rule was revised to "Retail" marijuana from "Medical" marijuanaMED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-435(A)Retail Marijuana Testing Facilities: Proficiency TestingRevision44-10-202(4), 44-10-203(1)(c), 44- 10-203(1)(k), 44-10-203(2)(d), 44- 10-401(2)(b)(IV), and 44-10-604, C.R.S.Rule was revised to add "if required by the Division" for clarity and compliance.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-441 Basis & PurposeRetail Marijuana Testing Facilities: Certificate of Analysis (COA)Revision44-10-203(2)(d), 44-10-401(2)(a) (IV), and 44-10-604, C.R.S.Rule was revised to correct the reference from 44-10-504 to 44-10-604.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-505(E)Retail Marijuana Transporter: License PrivilegesRepeal44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-203(2)(h), 44-10-203(2)(n), 44-10-203(3)(c), 44-10-313(14), 44-10-401(2)(b) (V), and 44-10-605, C.R.S.Repealed subparagraph (1) and updated subparagraph (2) by striking the effective date.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-620(A)(1)Retail Marijuana Business Operators: Business Records RequiredRevision44-10-202(1)(c), 44-10-203(1)(c), and 44-10-203(1)(k), C.R.S.Rule was revised to remove reference to diagram of the Licensed Premises in accordance to HB 25-1209.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-700 SeriesAccelerator Cultivator LicensesRepeal44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(1)(k), 44-10-203(2)(h), 44-10-203(2)(j), 44-10-203(2)(r), 44-10-203(2)(aa), 44-10-203(3)(c), 44-10-401(2)(b)(VII), 44-10-602, and 44-10-607 C.R.S.Accelerator Rule series repealed - rules integrated into the Retail marijuana series.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-800 SeriesAccelerator Manufacturer LicensesRepeal44-10-202(1)(c), 44-10-203(1)(a), 44-10-203(2)(d), 44-10-203(2)(f), 44-10-203(2)(g), 44-10-203(2)(i), 44-10-203(2)(y), 44-10-203(2)(aa), 44-10-307(1)(j), 44-10-401(2)(b) (VIII), 44-10-603 and 44-10-608, C.R.S.Accelerator Rule series repealed - rules integrated into the Retail marijuana series.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-905(O)(2)Licensed Hospitality Businesses: General ProvisionsRevision44-10-202(1), 44-10-203(2)(ff), 44-10-305(2)(b), 44-10-609, and 44-10-610, C.R.S.Rule was revised to remove reference to 3-905 and the requirement to document destruction of Regulated marijuana on a waste log.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-915(D)Licensed Hospitality Businesses: Operation Within a Retail Food EstablishmentRevision44-10-202(1), 44-10-203(2)(ff), 44-10-305(2)(b), 44-10-609, and 44-10-610, C.R.S.Rule was revised to remove "and Identification Badge" in accordance with HB 25-1209.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-926(D)Licensed Marijuana Hospitality Businesses: Spa BusinessesRevision44-10-202(1), 44-10-203(2)(ff), 44-10-305(2)(b), 44-10-609, and 44-10-610, C.R.S.Rule was revised to remove video surveillance requirement for all points of ingress and egress in accordance with HB 25-1209.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-940(C)(5)Marijuana Hospitality Business: Requirements for Mobile PremisesRepeal44-10-202(1), 44-10-203(2)(ff), 44-10-305(2)(b), and 44-10-609, C.R.S.Rule was repealed.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-940(D)Marijuana Hospitality Business: Requirements for Mobile PremisesRevision44-10-202(1), 44-10-203(2)(ff), 44-10-305(2)(b), and 44-10-609, C.R.S.Rule was revised to remove what "operation" of mobile premises means.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-1100 SeriesAccelerator Store LicensesRepeal44-10-202(1)(c), 44-10-203(1)(k), 44-10-203(2)(aa), 44-10-203(2) (dd), 44-10-401(2)(b)(I), 44-10- 601, 44-10-605, and 44-10-611, C. R.S.Accelerator Rule series repealed - rules integrated into the Retail marijuana series.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 7-115(B), 1 CCR 212-3 7-115(C) & 1 CCR 212-3 7-115(F)Pesticide ManufacturersRevision44-10-202(1)(a)(II), 44-10-202(1) (c), 44-10-203(1)(c), and 44-10-203(1)(k), C.R.S.Rules were revised to remove reference to 3-905 in accordance with HB 25-1209.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 8-110(B)(2) (b), 1 CCR 212-3 8-110 (B.5)(2)(c), 1 CCR 212-3 8-115(B)(2) & 1 CCR 212- 3 8-115(B)(3)Requirement for Inspections and Investigations, Searches, Administrative Holds, Embargos, Voluntary SurrendersRevision44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(1)(f), 44-10-202(1)(g), 44-10-203(2)(g), 44-10-203(2)(h), 44-10-207, 44-10-203(1)(k), and 44-10-902, C.R.S. and 44-10-202(1)(c), 44-10-203(1)(c), 44-10-203(1)(f), 44-10-203(1)(g), 44-10-203(1)(k), and 44-10-902, C.R.S.Rules were revised to add "video" in front of surveillance for consistency and clarity.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 8-215(B)(3)Suspension Process: Regular and Summary SuspensionsNew44-10-202(1)(c), 44-10-202(1)(d), 44-10-203(1)(k), 44-10-203(2)(a), 44-10-203(2)(l), 44-10-701, 44-10- 901, 24-4-104(4)(a), and 24-4- 105, C.R.S. Authority also exists in the Colorado Constitution at Article XVIII, Subsection 16(5)(a) (I).A new rule was added to clarify that a during a period of active suspension of an employee license, the employee is not allowed to exercise any privileges.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 8-220(A)(4)Administrative HearingsRevision44-10-202(1)(c), 44-10-202(1)(d), 44-10-203(1)(k), 44-10-203(2)(a), 44-10-203(2)(g), 44-10-203(2)(l), 44-10-204(1)(a), 44-10-701, 44- 10-901, 24-4-104, and 24-4-105, C.R.S. Authority also exists in the Colorado Constitution at Article XVIII, Subsection 16(5)(a)(I).Rule was revised to replace "pleadings" with "filings" for a more accurate description.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 8-240(A)Confidential Information and Former State Licensing Authority EmployeesRevision44-10-201(3), 44-10-201(4), 44- 10-202(1)(c), 44-10-203(1)(k), 44- 10-203(2)(l), 44-10-203(2)(m), 44- 10-203(1)(e), and 44-10-204(1) (a), C.R.S.Rule was revised from a class 1 misdemeanor to a class 2 misdemeanor.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 3-240(C)(1) (a), 1 CCR 212-3 3-325 (A), 1 CCR 212-3 3-330 Basis & Purpose, 1 CCR 212-3 3-335(A)(2), 1 CCR 212-3 3-335(B), 1 CCR 212-3 3-335(C), 1 CCR 212-3 3-335(C)(2), 1 CCR 212-3 3-336(B), 1 CCR 212-3 3-610(E)(1), 1 CCR 212-3 3-615(A)(4), 1 CCR 212-3 3-615(A)(5)(a), 1 CCR 212-3 3-615(A)(5) (b), 1 CCR 212-3 3-615 (A)(5)(c), 1 CCR 212-3 3- 615(C), 1 CCR 212-3 3- 615(E)(1), 1 CCR 212-3 3- 615(E)(2), 1 CCR 212-3 3- 615(F)(1), 1 CCR 212-3 3- 615(F)(2), 1 CCR 212-3 3- 615(F)(4), 1 CCR 212-3 3- 615(F)(5), 1 CCR 212-3 3- 615(F)(6), 1 CCR 212-3 3- 615(G)(1), 1 CCR 212-3 3-615(G)(2), 1 CCR 212-3 3-615(G)(3), 1 CCR 212-3 3-615(G)(4), 1 CCR 212-3 3-615(G)(5), 1 CCR 212-3 3-615(G)(7)(a), 1 CCR 212-3 3-615(G)(8)(c), 1 CCR 212-3 3-615(G)(8) (d), 1 CCR 212-3 3-615 (G)(9), 1 CCR 212-3 3- 615(H), 1 CCR 212-3 3- 820(A), 1 CCR 212-3 3- 820(B)(1), 1 CCR 212-3 3- 820(B)(2), 1 CCR 212-3 3- 820(B)(3), 1 CCR 212-3 3- 920(A), 1 CCR 212-3 3- 1005(B)(2)(a), 1 CCR 212-3 3-1005(B)(2)(c), 1 CCR 212-3 3-1005(B)(2) (d), 1 CCR 212-3 3-1005 (E)(2)(a), 1 CCR 212-3 3- 1005(F), 1 CCR 212-3 3- 1005(J), 1 CCR 212-3 3- 1010(B)(11)(a), 1 CCR 212-3 3-1010(B)(11)(b), 1 CCR 212-3 3-1010(C), 1 CCR 212-3 3-1010(D), 1 CCR 212-3 3-1010(E), 1 CCR 212-3 3-1010(E)(3) (a)(i), 1 CCR 212-3 3- 1010(E)(3)(a)(ii), 1 CCR 212-3 3-1010(E)(3)(d), 1 CCR 212-3 4-230(B)(1) & 1 CCR 212-3 4-230(D)(1)Various sections throughout ruleRevision44-10-202(1)(b)-(c), 44-10-203(1) (a), 44-10-203(1)(c), 44-10-203(1) (k), 44-10-203(2)(l), 44-10-203(2) (m), and 44-10-901(1), C.R.S.Rules were revised to combine "Medical" licenses, "Retail" licenses, and "Accelerator" licenses into "Regulated marijuana licenses".MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 3-110(A)(2), 1 CCR 212-3 3-805(I)(7), 1 CCR 212-3 3-805(I)(8), 1 CCR 212-3 3-810(A)(1), 1 CCR 212-3 3-820 Basis & Purpose, 1 CCR 212-3 3-820 Title, 1 CCR 212-3 3-820(B)(1), 1 CCR 212-3 3-820(B)(2), 1 CCR 212-3 3-820(B)(3), 1 CCR 212-3 3-920(A), 1 CCR 212-3 3- 1005(E), 1 CCR 212-3 3- 1005(E)(1), 1 CCR 212-3 3-1005(E)(2), 1 CCR 212- 3 3-1005(E)(2)(a), 1 CCR 212-3 3-1005(E)(2)(b), 1 CCR 212-3 3-1005(E)(2) (d)(i), 1 CCR 212-3 3- 1005(E)(2)(d)(ii), 1 CCR 212-3 3-1005(E)(2)(g)(i), 1 CCR 212-3 5-115(E), 1 CCR 212-3 5-205(C)(2), 1 CCR 212-3 5-205(F), 1 CCR 212-3 5-210(B), 1 CCR 212-3 5-230 Basis & Purpose, 1 CCR 212-3 5- 230(A), 1 CCR 212-3 5- 230(A)(1), 1 CCR 212-3 5-230(A)(2), 1 CCR 212-3 5-230(A)(3), 1 CCR 212-3 5-230(A)(4), 1 CCR 212-3 5-230(A)(5), 1 CCR 212-3 5-230(B), 1 CCR 212-3 5- 230(C), 1 CCR 212-3 5- 230(C)(1), 1 CCR 212-3 5-230(C)(2), 1 CCR 212-3 5-230(C)(3), 1 CCR 212-3 5-230(C)(4), 1 CCR 212-3 5-230(C)(5), 1 CCR 212-3 5-230(C)(6), 1 CCR 212-3 5-230(D)(1), 1 CCR 212-3 5-230(E), 1 CCR 212-3 5- 230(F), 1 CCR 212-3 5- 305(B)(3), 1 CCR 212-3 5- 305(G), 1 CCR 212-3 5- 310(C), 1 CCR 212-3 5- 320 Basis & Purpose, 1 CCR 212-3 5-320 Title, 5- 320(B), 1 CCR 212-3 5- 320(A), 1 CCR 212-3 5- 320(A)(1), 1 CCR 212-3 5-320(A)(2), 1 CCR 212-3 5-320(A)(3), 1 CCR 212-3 5-320(A)(4), 1 CCR 212-3 5-320(A)(5), 1 CCR 212-3 5-230(C)(1), 1 CCR 212-3 5-230(C)(2), 1 CCR 212-3Various sections throughout ruleRevision44-10-202(1)(b)-(c), 44-10-203(1) (a), 44-10-203(1)(c), 44-10-203(1) (k), 44-10-203(2)(l), 44-10-203(2) (m), and 44-10-901(1), C.R.S.Rules were revised to replace "Sampling Managers" with "designated employees" & "sampling" with "R-and-D" units in accordance with HB 25-1209.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-105 Basis & Purpose, 1 CCR 212-3 6-110 Basis & Purpose, 1 CCR 212-3 6-115 Basis & Purpose, 1 CCR 212-3 6- 205 Basis & Purpose, 1 CCR 212-3 6-210 Basis & Purpose, 1 CCR 212-3 6- 215 Basis & Purpose, 1 CCR 212-3 6-220 Basis & Purpose, 1 CCR 212-3 6- 225 Basis & Purpose, 1 CCR 212-3 6-230 Basis & Purpose, 1 CCR 212-3 6- 235 Basis & Purpose, 1 CCR 212-3 6-305 Basis & Purpose, 1 CCR 212-3 6- 310 Basis & Purpose & 1 CCR 212-3 6-315 Basis & PurposeVarious sections throughout ruleRevision44-10-202(1)(b)-(c), 44-10-203(1) (a), 44-10-203(1)(c), 44-10-203(1) (k), 44-10-203(2)(l), 44-10-203(2) (m), and 44-10-901(1), C.R.S.Basis and Purposes were revised to add Accelerator statute citations.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 6-105 Basis & Purpose, 1 CCR 212-3 6-110 Basis & Purpose, 1 CCR 212-3 6-115 Basis & Purpose, 1 CCR 212-3 6- 205 Basis & Purpose, 1 CCR 212-3 6-210 Basis & Purpose, 1 CCR 212-3 6- 215 Basis & Purpose, 1 CCR 212-3 6-220 Basis & Purpose, 1 CCR 212-3 6- 225 Basis & Purpose, 1 CCR 212-3 6-230 Basis & Purpose, 1 CCR 212-3 6- 235 Basis & Purpose, 1 CCR 212-3 6-305 Basis & Purpose, 1 CCR 212-3 6- 310 Basis & Purpose, 1 CCR 212-3 6-315 Basis & Purpose, 1 CCR 212-3 6- 325 Basis & Purpose, 1 CCR 212-3 6-335 Basis & Purpose,Various sections throughout ruleRevision44-10-202(1)(b)-(c), 44-10-203(1) (a), 44-10-203(1)(c), 44-10-203(1) (k), 44-10-203(2)(l), 44-10-203(2) (m), and 44-10-901(1), C.R.S.Rules were revised to remove reference to Accelerator Stores and to remove Accelerator rules citations throughout the rules.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
3-320(D)(1), 3-1005(G) (1), 3-1010(C)(3)(e)(i), 3- 1025(B)(2)(a), 3-1025(D) (2)(a), 4-210(C)(1), 4- 210(C)(2)(a), 4-215(E) (1), 4-215(E)(2), 4-215(E) (4), 4-215(E)(5), 4-215 (G), 4-215(I), 4-225(E)(2) (c), 4-225(F)(2), 4-225(F) (4)(c)(i) - Table, 4-230 (B)(1), 4-230(C), 4-230 (H) & (H)(3), 4-230(I), 4- 230(L)(1), (2) & (3), 4- 230(M)(1)(a), (a)(i) & (a) (ii), 4-230(N)(3)(b), 4- 240(C)(2)(a)(i), 4-240(C) (2)(a)(ii), 4-240(C)(3)(a) (i) & (ii), 4-240(C)(3)(c) (iv)(A), (C), (H) & (I), 4-245(B)(1) & (2), 4-245 (C), 5-205(C)(3)(b)(vi), 6-205(C)(3)(b)(vi),Various sections throughout ruleRevision44-10-202(1)(b)-(c), 44-10-203(1) (a), 44-10-203(1)(c), 44-10-203(1) (k), 44-10-203(2)(l), 44-10-203(2) (m), and 44-10-901(1), C.R.S.Rules were revised to replace "Harvest Batch" with "Production Batch" for clarity and compliance.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
1 CCR 212-3 3-315(B)(4), 1 CCR 212-3 3-336(D)(1), 1 CCR 212-3 3-336(D)(2) (b)(iv), 1 CCR 212-3 3- 336(D)(2)(c)(vi), 1 CCR 212-3 3-605(G)(3)(a), 1 CCR 212-3 3-920(C), 1 CCR 212-3 3-1010(C)(3) (b), 1 CCR 212-3 4-205 (A)(2), 1 CCR 212-3 4- 215(A)(1), 1 CCR 212-3 4-215(E)(6)(a), 1 CCR 212-3 4-215(E)(6)(b), 1 CCR 212-3 4-215(F), 1 CCR 212-3 4-220(A)(2), 1 CCR 212-3 4-220(A)(2)(b) (ii), 1 CCR 212-3 4-225 (A)(2), 1 CCR 212-3 4- 225(3), 1 CCR 212-3 4- 225(B), 1 CCR 212-3 4- 225(B)(1)(a), 1 CCR 212- 3 4-225(B)(2), 1 CCR 212- 3 4-225(E), 1 CCR 212-3 4-230(G) - Table Note, 1 CCR 212-3 4-230(K)(1) (h), 1 CCR 212-3 4-230 (K)(2), 1 CCR 212-3 4-230 (L)(1), 1 CCR 212-3 4-230 (L)(2), 1 CCR 212-3 4-230 (L)(3), 1 CCR 212-3 4-240 (A)(2), 1 CCR 212-3 4- 240(B), 1 CCR 212-3 4- 240(B)(1), 1 CCR 212-3 4- 240(B)(2), 1 CCR 212-3 4- 240(C), 1 CCR 212-3 4- 240(C)(1), 1 CCR 212-3 4-240(C)(2), 1 CCR 212- 3 4-240(C)(2)(c)(ii)(A), 1 CCR 212-3 4-240(C)(2)(c) (iii)(A), 1 CCR 212-3 4- 240(C)(3), 1 CCR 212-3 4-240(C)(3)(c)(iv)(A), 1 CCR 212-3 4-240(C), 1 CCR 212-3 4-240(H), 1 CCR 212-3 4-240(I), 1 CCR 212-3 5-240(C)(9) (a), 1 CCR 212-3 5-240 (C)(9)(b) & 1 CCR 212-3 6-235(C)(9)Various sections throughout ruleRevision44-10-202(1)(b)-(c), 44-10-203(1) (a), 44-10-203(1)(c), 44-10-203(1) (k), 44-10-203(2)(l), 44-10-203(2) (m), and 44-10-901(1), C.R.S.Rules were revised to remove "Harvest Batch" for clarity and compliance.MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
3-330 Basis & Purpose, 3-905(B)(13), 4-205(A)(1), 4-205(D), 4-215(B)(1) - Table, 4-215(C)(1) - Table, 4-215(D)(1) - Table, 4-215(F), 4-215(J) (3) & (J)(3)(xi), 4-215(J) (5)(a)(ii), 5-315(C)(1), 5- 315(D)(2), 5-415(A)(1), 6-315(C)(1) & (D)(2), 6- 415(A)(2),Various sections throughout ruleRevision44-10-202(1)(b)-(c), 44-10-203(1) (a), 44-10-203(1)(c), 44-10-203(1) (k), 44-10-203(2)(l), 44-10-203(2) (m), and 44-10-901(1), C.R.S.Rules were revised to replace "microbials" with the proper terminology "Microbial Contaminants".MED Stakeholder ListOngoingAnticipated adoption date 11/5/2025 
Results of Mandatory Rules Efficiency Review
Schedule (month & year reviewed)Rule Number (ex: 1 CCR 201-1, Rule #101)Rule Title (or Brief Description )Statutory or other basis for adoption of ruleDid review result in revisions to regulation?Did review result in repeal of any part of the regulation? If so, how many rules?Did review result in repeal of entire CCR volume?Adoption date (if applicable, if not put N/A and describe in the comments)Comments (optional)
August 20251 CCR 212-3 Rule 3-330Cultivation of Regulated Marijuana: Specific Health and Safety Requirements44-10-203(1)(c), 44-10-203(1)(k), 44-10-203(2)(d), 44-10-203(2)(g), 44-10-203(2)(h), 44-10-203(2)(i), 44-10-203(3)(c), 44-10-203(3)(e), and 44-10-1001, C.R.S.YesNoNoAnticipated adoption date 11/5/2025 
August 20251 CCR 212-3 Rule 4-215Regulated Marijuana Testing Program: Contaminant Testing44-10-202(1)(c), 44-10-203(1)(a), 44-10-203(1)(c), 44-10-203(1)(g), 44-10-203(1)(k), 44-10-203(2)(d), 44-10-203(2)(f), 44-10-203(3)(d), 44-10-203(3)(e), 44-10-501(6), 44- 10-502(3), 44-10-503(8), 44-10- 504(1)(b), 44-10-504(2), 44-10- 601(4), 44-10-602(4), 44-10-603 (6), 44-10-604(1)(b), and 44-10- 604(2), C.R.S. Authority also exists in the Colorado Constitution at Article XVIII, Subsection 16(5)(a)(VII).YesNoNoAnticipated adoption date 11/5/2025 
August 20251 CCR 212-3 Rule 4-240Regulated Marijuana Testing Program: Contaminated Product and Failed Test Results and Procedures44-10-202(1)(c), 44-10-203(1)(a), 44-10-203(1)(c), 44-10-203(1)(g), 44-10-203(1)(k), 44-10-203(2)(d), 44-10-203(2)(f), 44-10-203(3)(d), 44-10-203(3)(e), 44-10-501(6), 44- 10-502(3), 44-10-503(8), 44-10- 504(1)(b), 44-10-504(2), 44-10- 601(4), 44-10-602(4), 44-10-603 (6), 44-10-604(1)(b), and 44-10- 604(2), C.R.S. Authority also exists in the Colorado Constitution at Article XVIII, Subsection 16(5)(a)(VII).YesNoNoAnticipated adoption date 11/5/2025 
August 20251 CCR 212-3 Rule 5-440Medical Marijuana Testing Facilities: Quality Assurance and Quality Control44-10-203(2)(d), 44-10-401(2)(a) (IV), and 44-10-504, C.R.S.YesNoNoAnticipated adoption date 11/5/2025 